![Tait TB7100 Installation And Operation Manual Download Page 16](http://html2.mh-extra.com/html/tait/tb7100/tb7100_installation-and-operation-manual_3295622016.webp)
16
Mechanical Description
TB7100 Installation and Operation Manual
© Tait Electronics Limited
December 2005
2.1
Tray
The 1U tray consists of a mild steel folded chassis and a flat cover (not
shown) which is fastened to the chassis with 15 Torx T10 screws. The tray
can be fitted into a standard 19 inch rack or cabinet using the two rack
mounting brackets.
The front panel has holes to accommodate the controls and the
microphone/programming connector of the UI board.
The rear panel has holes to accommodate the connectors and the fuse holder
of the SI board, the antenna connectors, and a ground terminal.
For more information on the connections, refer to
“Connections” on
page 65
.
2.2
UI Board
The UI board is mounted behind the front panel with three Torx T10
screws
c
and two spring clips
D
. The UI board is connected to the
transmitter and receiver modules via the two Micro-MaTch connectors
e
and the two UI cables (not shown). The UI board also has a speaker
connector
b
.
A volume knob is fitted to the shaft of the volume-control potentiometer.
Figure 2.2
UI board
e
d
c
b
Cables not shown.
Summary of Contents for TB7100
Page 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Page 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...