Open the data form and in the general tab:
■
In the command mode section disable all check boxes.
■
In the transparent mode section select transparent mode enabled
and THSD modem enabled and de-select the ignore escape
sequence check box.
■
Set Power Up State to THSD transparent mode.
8.
Open the data form and in the serial communications tab:
■
In the serial communications setup field set the THSD transparent
mode baud rate to 9600, the Flow control to None and the data
port to the required data port.
■
Ensure hardware flow control is set to None.
9.
Open the data form RF modems tab. The FFSK modem settings do
not apply and can be ignored. In the THSD modem section set up
the following:
■
Wide band modem enabled
■
Layer 2 Protocol enabled
■
Forward Error Correction disabled
■
THSD Lead-In Delay default of 30ms is acceptable.
10.
Program the receiver.
7.5.9
Verification
In order to verify the correct operation as an RF modem a basic functional
test can be carried out by sending data between the TB7100 base station and
a TM8000 mobile radio.
The following equipment will be required:
■
DC power supply
■
antenna for receiver input
■
dummy load for transmitter output
■
a PC running the terminal application connected to the serial data port
on the base station with a 9-pin serial cable
■
a second PC running the terminal application connected to a TM8000
mobile radio which has been programmed to send and receive the
required data modulation (FFSK or THSD).
The test setup is shown in
“RF modem test setup” on page 101
.
Summary of Contents for TB7100
Page 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Page 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...