![Tait TB7100 Installation And Operation Manual Download Page 113](http://html2.mh-extra.com/html/tait/tb7100/tb7100_installation-and-operation-manual_3295622113.webp)
TB7100 Installation and Operation Manual
Preparation for Operation
113
© Tait Electronics Limited
December 2005
Programmable I/O line. This line could be connected to the lighting
control circuit at the site via the system interface connector.
Example Two
The customer also wants an acknowledgement sent back to confirm that the
command to turn on the lights was received.
At first the solution would appear to be to enable Selcall auto
acknowledgments. However this would not work, because the base station
has separate receiver and transmitter modules. The receiver module will
decode the selcall and enable the I/O line, but has no method of informing
the transmitter to send back an acknowledgment. In fact the receiver
module would attempt to transmit the acknowledgment itself, but would be
inhibited by other mandatory settings.
7.8.6
Function Keys
The base station also has four user-defined function keys on the user
interface, and programmable digital input and output lines on the system
connector.
The tables below list the options that can be assigned to the function keys
and the digital input and output lines. The grey cells can be programmed
but are not recommended (see
“Recommended Settings” on page 112
).
Function Key Options
None
Monitor / Squelch Override
Audible Indicators Volume
Network Preset Calls
Action Digital Output Line
Nuisance Delete
Backlighting Timer
Phone Patch Call Request / Release
Backlighting Toggle
Preset Channel
Backlighting Timer / Toggle
Public Address
Call Cleardown
Quiet Operation
Channel Preset Call
Repeater Access Tone Tx
Emergency Mode
Repeater Talkaround
Encryption
Reset Monitor
Group Scanning Activity
Reset Monitor / Call Cleardown
Ignore Two-Tone
Silent Operation
Keypress Tones Toggle
Single In-Band Tone
Keypress Tones Volume
Squelch Override
Low Power Transmit
Scanning / Nuisance Delete
Monitor
Summary of Contents for TB7100
Page 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Page 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...