![Tait TB7100 Installation And Operation Manual Download Page 81](http://html2.mh-extra.com/html/tait/tb7100/tb7100_installation-and-operation-manual_3295622081.webp)
TB7100 Installation and Operation Manual
Preparation for Operation
81
© Tait Electronics Limited
December 2005
7.3.4
Applying Power
Before turning on the base station, check that:
■
all looms and cables at the front and rear of the base station are fitted
correctly
■
all connectors are secure
■
the 20A fuse is fitted.
Turn on the power supply and check that the base station powers up
correctly:
■
The power LED on the user interface lights up.
■
The LCD indicates the current channel number.
Figure 7.2
System interface link positions
J400
J500
J502
J503
J207
W401
W402
J206
J507
J501
Summary of Contents for TB7100
Page 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Page 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...