9.
Enter the crane operator’s cab, and adjust the seat
and the length of each lever so that you can easily oper-
ate the levers and all other controls.
(“Crane Operator’s Cab”
……………………………
P. 66)
10.
In the crane operator’s cab, turn the starter switch
ON.
11.
Select the operational status on the AML.
(“AML <Overload Prevention Device>”
……………
P. 24)
12.
Take out the main hook block from its stowed posi-
tion.
(“Taking Out and Stowing the Main Hook Block”
…
P. 88)
13.
Perform the preoperational checks for after the en-
gine has been started.
(“Preoperational and Periodic Inspection”
………
P. 132)
14.
Reeve the wire rope round the main hook block
sheaves as required for the operation.
◆
Register the number of part lines of rope on the AML if
the actual number is smaller than the standard one.
(“Reeving the Wire Rope”
……………………………
P. 90)
15.
Mount the single top or jib as necessary.
(“Single Top”
…………………………………………
P. 95)
(“Jib”
…………………………………………………
P. 100)
16.
Select the operational status on the AML, when the
single-top sheave system or the jib is installed.
(“AML <Overload Prevention Device>”
……………
P. 24)
During Operation
1.
Follow the rated lifting capacity table to eliminate
any possibility of overloading.
(“How to Read Performance Data Plate”
…………
P. 16)
(“Acceleration”
………………………………………
P. 70)
(“Hoisting”
……………………………………………
P. 72)
(“Telescoping the Boom”
……………………………
P. 75)
(“Elevating the Boom”
………………………………
P. 81)
(“Swinging the Boom”
………………………………
P. 84)
(“Single Top”
…………………………………………
P. 95)
(“Jib”
…………………………………………………
P. 100)
◆
When the AML activates an alarm in response to
overloading, take appropriate corrective measures.
(“AML <Overload Prevention Device>”
……………
P. 24)
◆
When an error occurs in the AML system, take the
corrective measure indicated by the failure message dis-
played on the AML.
(“AML <Overload Prevention Device>”
……………
P. 24)
◆
When a safety device other than the AML is activated
(such as the overwind cutout device), take the appropri-
ate corrective measures.
(“Other Safety Devices”
……………………………
P. 52)
◆
Use the air conditioner, and other equipment in the
crane operator’s cab, as necessary.
(“Equipment Inside the Cab”
………………………
P. 125)
◆
When the ambient temperature is high, use the oil
cooler as necessary.
(“Equipment Inside the Cab”
………………………
P. 125)
T038280E
14
Crane Operation Procedure—Summary
Crane Operation Procedure—Summary
Summary of Contents for GT-550E-2
Page 20: ...A 19 Safety Rules Safety Rules...
Page 23: ...A 22 Safety Rules Safety Rules...
Page 29: ...A 28 Safety Rules Safety Rules...
Page 30: ...A 29 Warning Labels Warning Labels...
Page 32: ...A 31 Warning Labels Warning Labels 1 2 3 JIB PIN STATUS...
Page 36: ...1 Contents Contents...
Page 37: ...2 Contents Contents...
Page 38: ......
Page 41: ...6 Layout of Controls Layout of Controls of Controls Layo out...
Page 46: ...H000450E OPERATION...
Page 73: ......