QTY
#S02
#S36
4
4
Screw
QTY
#S37
4
Connector
QTY
#L04G
2
Profile
Install Trays and Bin Holder
From the inside of the geenhouse, place the trays on the
shelves. The trays interlock together and rest on the
lip on the sides of the shelve profiles. Fifteen
trays fit on each side of the greenhouse.
Slide long side of
connector S37 into
each end of profiles
L04G, lining up the
last hole on the
connector with the
hole in the channel.
Place profiles L04G on shelve
profiles. Position to fit your bin.
QTY
#J05
Trays
30
!
Place all the parts for the trays and bin holder on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
17.1
17.2A
17.3A
S36
S37
S02
Secure each S37 connector
with one S02 screw.
Secure each connector with
one S36 screw.
17.3B
17.2B
IMPORTANT: S36 are self tapping screws used to screw into areas that do not have predrilled holes. When you
have decided on the placement of your bin, use these screws to attach the L04G profiles into the shelf profiles.
NOTE: A cordless drill with a phillips head bit is recommended.
56 of 56
www.stcny.com
L04G
L04G
Summary of Contents for Easy2Build
Page 2: ......
Page 59: ...Notes...