
Brace Sides
From the inside of the greenhouse, insert long side of cable connector
S06 into profile channel L07C with hook facing the front. Slide connector to
other side of channel. Use hex key to securely tighten and hold in place.
Repeat step 9.1 inserting cable connectors S06 into profile L07C
with hook facing the back and into profile L01D with hook
facing the front. Cable rests behind profile L14B. Slide
connector until profile corners are square and cable is
tight. Use hex key to securely tighten second
connector and hold in place.
!
Place all the parts for bracing the sides on a level surface.
Make sure the pieces are in the correct positions before assembling.
Please carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including shoes, gloves and goggles.
Attach one side of long cable S07 to hook and
lace behind profile L14B. Attach other side of
cable to a second S06 cable connector. With
hook facing the back, insert connector into
profile channel L01D.
9.1A
9.1B
9.1C
Push towards center until
profile corners are square and cable
is tight. Use hex key
to securely tighten
and hold in place.
9.2
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
IMPORTANT: Make sure all corners
are squared at 90 degrees.
IMPORTANT: Make sure all corners
are squared at 90 degrees.
L14B
L01D
L03T
L07C
L02B
43 of 56
www.stcny.com
L01D
L03T
L01D
L03T
L07C
L03T
L01D
L02B
L07C
L02B
2
#S07
#S06
QTY
QTY
4
Cable Connector
Cable
QTY
1
Hex Key
L14B
L01D
L03T
L07C
L02B
Summary of Contents for Easy2Build
Page 2: ......
Page 59: ...Notes...