8/105 |
S-BM2
Assessed Performance
19 CE 1396
Systemair Production a.s.
90043 Kalinkovo 371, Slovakia
19
1396-CPR-0157
EN 12101-8:2011
Smoke control damper
Multi compartment
S-BM2
Nominal activation conditions/sensitivity
• Manual intervention -
passed
Closure/opening during test at correct time and in allowable time
Response delay/closure time - Manual intervention -
passed
Operational reliability
10 000 operations: 0° to 90° -
passed
and 45° to 60° -
passed
HOT 400/30 -
passed
Fire resistance:
• Integrity
E
• EI120(v
ew
-v
ed
-h
od
-h
ow
-i↔o)S1000C
mod
HOT400/30MAmulti
• Damper with vertically oriented blades: EI90(v
ew
i↔o)S1000C
mod
MAmulti
• Insulation
I
• Smoke leakage
S
• Mechanical stability (under E)
• Maintenance of cross section (under E)
Durability:
• of response delay -
Pass
• of operational reliability -
Pass
Summary of Contents for A-S-BM2
Page 1: ...S BM2 Smoke Control Damper MA multi ...
Page 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Page 26: ...26 105 S BM2 ...
Page 27: ...27 105 S BM2 ...
Page 28: ...28 105 S BM2 ...
Page 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Page 30: ...30 105 S BM2 Damper minimum distances ...
Page 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 33: ...33 105 S BM2 ...
Page 34: ...34 105 S BM2 Fixing layout for battery installations ...
Page 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 38: ...38 105 S BM2 ...
Page 39: ...39 105 S BM2 ...
Page 40: ...40 105 S BM2 ...
Page 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 44: ...44 105 S BM2 ...
Page 45: ...45 105 S BM2 ...
Page 46: ...46 105 S BM2 ...
Page 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Page 48: ...48 105 S BM2 Damper minimum distances ...
Page 51: ...51 105 S BM2 ...
Page 52: ...52 105 S BM2 ...
Page 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 56: ...56 105 S BM2 ...
Page 57: ...57 105 S BM2 Fixing layout for battery installations ...
Page 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 61: ...61 105 S BM2 ...
Page 62: ...62 105 S BM2 ...
Page 63: ...63 105 S BM2 ...
Page 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 67: ...67 105 S BM2 ...
Page 68: ...68 105 S BM2 ...
Page 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Page 72: ...72 105 S BM2 ...
Page 75: ...75 105 S BM2 ...
Page 78: ...78 105 S BM2 ...
Page 79: ...79 105 S BM2 ...
Page 82: ...82 105 S BM2 ...
Page 83: ...83 105 S BM2 ...
Page 84: ...84 105 S BM2 ...
Page 87: ...87 105 S BM2 ...
Page 88: ...88 105 S BM2 ...
Page 89: ...89 105 S BM2 ...
Page 90: ...90 105 S BM2 ...
Page 100: ...100 105 S BM2 ...
Page 101: ...101 105 S BM2 ...
Page 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...