59/105 |
S-BM2
Legend for installation 3. SOFT - in the Wall assembled in battery
1
- Smoke control damper S-BM2
2
- Connected ductwork made of Promatect-L500 boards (min. 500 kg/m3, Promat)
3
- Concrete/masonry/cellular concrete wall or ceiling
4
- Flexible (plasterboard) wall
4a
- 2 layers of plasterboard fireproof plate type F, EN 520
4b
- Vertical CW – profiles
4c
- Horizontal UW – profiles
4d
- Mineral wool; thickness/cubic density see picture.
5
- Grille
7
- Connected sheet metal ductwork tested according to EN 1366-8 or EN 1366-9
F2
- Mineral wool filling (min. 100 kg/m³)
F4
- Nails or pins per ductwork manufacturer instructions
F5
- Fire resistive coating Promat K84 (Promat)
F8
- Screw M8×35, maximum fixing torque is 8 Nm ...12 Nm
F10
- Fireproof coating HILTI CSF-CT min. 2 mm
F11
- Screw M5 × ≥100 mm to concrete/Screw M4,5 × ≥120 mm to cellular concrete
F12
- Screw M5 × 60-70 mm (e.g. DIN 7982)
a)
- If connected to a duct, please follow the instructions duct manufacturer (maximum duct size width × height)
b)
- Internal stiffener is driven by the duct manufacturer instructions (Make sure to add where needed)
Y
- Cutting plane
Summary of Contents for A-S-BM2
Page 1: ...S BM2 Smoke Control Damper MA multi ...
Page 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Page 26: ...26 105 S BM2 ...
Page 27: ...27 105 S BM2 ...
Page 28: ...28 105 S BM2 ...
Page 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Page 30: ...30 105 S BM2 Damper minimum distances ...
Page 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 33: ...33 105 S BM2 ...
Page 34: ...34 105 S BM2 Fixing layout for battery installations ...
Page 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 38: ...38 105 S BM2 ...
Page 39: ...39 105 S BM2 ...
Page 40: ...40 105 S BM2 ...
Page 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 44: ...44 105 S BM2 ...
Page 45: ...45 105 S BM2 ...
Page 46: ...46 105 S BM2 ...
Page 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Page 48: ...48 105 S BM2 Damper minimum distances ...
Page 51: ...51 105 S BM2 ...
Page 52: ...52 105 S BM2 ...
Page 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 56: ...56 105 S BM2 ...
Page 57: ...57 105 S BM2 Fixing layout for battery installations ...
Page 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 61: ...61 105 S BM2 ...
Page 62: ...62 105 S BM2 ...
Page 63: ...63 105 S BM2 ...
Page 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 67: ...67 105 S BM2 ...
Page 68: ...68 105 S BM2 ...
Page 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Page 72: ...72 105 S BM2 ...
Page 75: ...75 105 S BM2 ...
Page 78: ...78 105 S BM2 ...
Page 79: ...79 105 S BM2 ...
Page 82: ...82 105 S BM2 ...
Page 83: ...83 105 S BM2 ...
Page 84: ...84 105 S BM2 ...
Page 87: ...87 105 S BM2 ...
Page 88: ...88 105 S BM2 ...
Page 89: ...89 105 S BM2 ...
Page 90: ...90 105 S BM2 ...
Page 100: ...100 105 S BM2 ...
Page 101: ...101 105 S BM2 ...
Page 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...