Using Mineral Wool filing
1.The supporting construction opening must be prepared as shown on picture. Opening surfaces must be even and
cleaned off. The flexible wall opening must be reinforced as per the standards for plasterboard walls. The opening
dimensions are driven by the nominal dimensions of the damper with added clearance. The opening will be with the
dimensions of W1 and H1.
2.Insert the damper as per the “Manipulation of S-BM2” section into the middle of the opening so that the damper
blade is in the wall. For damper widths greater than 600 mm, it is recommended to use a duct support inside the
damper during installation to avoid any damage caused to the damper housing by the weight of the filling.
For battery assembly:
a .Add the first layer of filling at the bottom of the opening - can be very thin.
b. Place the damper(s) on top while fixing them to the sides with screws (F11).
c. Stack the individual dampers on top of each other with caulk (F5) between them and fix together with screws
(F12) and to the wall with screws (F11) as depicted in fixing layout.
3.Fill in the area between the wall and the damper with mineral wool (F2) with a density of at least 100 kg/m3
thoroughly but in such a way that will not deform the duct/damper.
4.All the gaps around the filling and ceiling surface area at least 40 mm from the damper body must be covered by fire
resistive coating (F10).
5.Damper connections to duct and connection with overlap boards must be filled with coating (F5).
6.Check the functionality of the damper.
Installation Distances
According to the EN 1366-2 standard, the minimum distance from the wall or ceiling to the damper body is 75 mm.
For multiple crossings through a fire resistive wall, the minimum distance between two damper bodies is 200 mm.
This applies for distances between the damper body and a nearby foreign object crossing the fire resistive wall.
3 Soft
S-BM2
125 × 325 ... 1000 × 1225
EI 90 (v
ew
- i ↔ o)
S1000C
mod
HOT400/30
MAmulti
b)
≥ 125
EI 90 (v
ew
- i ↔ o)
S1000C
mod
MAmulti
b)
≥ 125
S-BM2
W > 1000, H > 1225 ... 2080 × 2530
EI 90 (v
ew
- i ↔ o)
S1000C
mod
HOT400/30
MAmulti
b)
≥ 125
Notes:
b)
- Concrete/masonry/cellular concrete (rigid) wall
v
ew
- Vertical wall placement
Summary of Contents for A-S-BM2
Page 1: ...S BM2 Smoke Control Damper MA multi ...
Page 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Page 26: ...26 105 S BM2 ...
Page 27: ...27 105 S BM2 ...
Page 28: ...28 105 S BM2 ...
Page 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Page 30: ...30 105 S BM2 Damper minimum distances ...
Page 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 33: ...33 105 S BM2 ...
Page 34: ...34 105 S BM2 Fixing layout for battery installations ...
Page 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 38: ...38 105 S BM2 ...
Page 39: ...39 105 S BM2 ...
Page 40: ...40 105 S BM2 ...
Page 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 44: ...44 105 S BM2 ...
Page 45: ...45 105 S BM2 ...
Page 46: ...46 105 S BM2 ...
Page 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Page 48: ...48 105 S BM2 Damper minimum distances ...
Page 51: ...51 105 S BM2 ...
Page 52: ...52 105 S BM2 ...
Page 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 56: ...56 105 S BM2 ...
Page 57: ...57 105 S BM2 Fixing layout for battery installations ...
Page 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 61: ...61 105 S BM2 ...
Page 62: ...62 105 S BM2 ...
Page 63: ...63 105 S BM2 ...
Page 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 67: ...67 105 S BM2 ...
Page 68: ...68 105 S BM2 ...
Page 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Page 72: ...72 105 S BM2 ...
Page 75: ...75 105 S BM2 ...
Page 78: ...78 105 S BM2 ...
Page 79: ...79 105 S BM2 ...
Page 82: ...82 105 S BM2 ...
Page 83: ...83 105 S BM2 ...
Page 84: ...84 105 S BM2 ...
Page 87: ...87 105 S BM2 ...
Page 88: ...88 105 S BM2 ...
Page 89: ...89 105 S BM2 ...
Page 90: ...90 105 S BM2 ...
Page 100: ...100 105 S BM2 ...
Page 101: ...101 105 S BM2 ...
Page 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...