PROGRAMMING

A  commissioning  operation  is  necessary  to  associate  the  RF 

gateway with its related RF devices. Commissioning the gateway 

is performed using the M200WC-RF USB RF interface connected 

to a PC running the appropriate software tools (see product code 

M200SCT-RF for details). The data file created when the system 

was designed is downloaded into the gateway and the gateway 

uses  this  information  to  configure  the  RF  system.  The  gateway 

searches for all its associated RF devices and programmes them 

with their network parameters; it then orchestrates the creation of a 

fully functional RF mesh network. (For further information, see the 

Radio Programming and Commissioning Manual

 - ref. D200-

306-00.)

NOTE:

 

Do not run more than one interface at a time to 

commission devices in an area.
NOTE: Batteries should not be fitted into RF devices until the 

system commissioning time

Loop Status LED (Note: Panel command generally has priority)

Isolator State 

Panel Command 

LED State 

Normal 

LED off  

Off (Amber blink if device fault) 

Open 

LED off  

Amber on 

Normal 

LED on 

Red on 

Open 

LED on 

Red on 

Normal 

LED blink 

Green blink (Amber if device fault) 

Open 

LED blink 

Amber on 

EN54-25: 2008 / AC: 2010 / AC: 2012

Components Using Radio Links

EN54-17: 2005 / AC: 2007 Short-Circuit Isolators

EN54-18: 2005 / AC: 2007 Input/Output Devices

for use in fire detection and fire alarm systems for buildings

0333 14

DOP-IRF001

Pittway Tecnologica S.r.l. 

Via Caboto 19/3, 34147 Trieste, Italy

RF status LED 

Gateway Status 

LED State 

Meaning 

Power-on initialisation  

(no fault) 

Long Green pulse 

Gateway is un-commissioned 
(factory default)  

3 Green blinks 

Gateway is (pre-)commissioned 

Fault 

Blink Amber every 1s. 

Gateway has an internal trouble 

Un-commissioned  

Red/Blue double-blink every 14s  
(or just Blue when communicating). 

Gateway is powered and is waiting to be 

programmed. 

Pre-commissioned

Blue/Red double-blink every 14s (or just 

Blue when communicating). 

Data has been downloaded into gateway, 

waiting to begin RF network commissioning.

Commissioning

Blue/Green double-blink every 14s (or 

just blue when communicating). 

Gateway has started commissioning, but 

complete RF network not yet created. 

Sync 

Blue/Amber double-blink every 14s 
(or just Blue when communicating). 

Trying to re synchronize the RF network 

from Idle status. 

Normal 

Blue blink every 14s. 

RF communications are established; 

gateway and network working properly. 

Network Fault 

Amber/Blue double-blink every 14s 

Gateway is experiencing an RF network 

problem. 

Recovery mode 

Blue/Blue double-blink every 14s 

RF network has one or more missing links 

and gateway is trying to reconfigure them. 

Patents Pending

LED INDICATORS AND FAULT DESCRIPTION

The Radio Gateway has two LED indicators:
LED1:  Loop communications status

LED2  RF communications status

EU Declaration of Conformity

Hereby, 

Life Safety Distribution GmbH declares 

that the radio equipment type

 M200G-RF 

is in 

compliance

 with directive 2014/53/EU

The full text of the EU DoC can be requested from:

[email protected]

Summary of Contents for M200G-RF

Page 1: ...tch closed 0 9A input voltage 29V Isolator max switching current 0 9A input voltage 29V Max isolation current switch open 15mA 24V Max series resistance switch closed 300 m ohm INSTALLATION This equipment and any associated wiring work must be installed in accordance with all relevant codes and regulations Figures 1 and 2 detail the installation of the B501AP base further instructions are availabl...

Page 2: ...on and fire alarm systems for buildings 0333 14 DOP IRF001 Pittway Tecnologica S r l Via Caboto 19 3 34147 Trieste Italy RF status LED Gateway Status LED State Meaning Power on initialisation no fault Long Green pulse Gateway is un commissioned factory default 3 Green blinks Gateway is pre commissioned Fault Blink Amber every 1s Gateway has an internal trouble Un commissioned Red Blue double blink...

Page 3: ...ntinua max dell isolatore chiuso 0 9A tensione in ingresso 29 V Corrente di commutazione max dell isolatore 0 9A tensione in ingresso 29 V Corrente di isolamento max aperto 15 mA a 24 V Resistenza in serie max chiuso 300 mOhm INSTALLAZIONE L installazione del presente dispositivo e di eventuali impianti associati deve essere eseguita in conformità ai codici e i regolamenti pertinenti Nelle figure ...

Page 4: ... di errore del dispositivo Aperto LED intermittente Acceso ambra STATO DEI LED E INDICAZIONE DEGLI ERRORI Il gateway è dotato di due LED che indicano rispettivamente lo stato della comunicazione sulla linea e verso la rete radio LED1 Stato delle comunicazioni sulla linea LED2 Stato delle comunicazioni sulla rete radio Stato del gateway e LED di rete radio Stato del gateway Stato del LED Significat...

Page 5: ...equeridas contra sobrecargas y cortocircuitos Aislador de lazo en la pasarela Corriente continua máx del aislador contacto cerrado 0 9A tensión de entrada 29V Corriente máx del aislador 0 9A tensión de entrada 29V Corriente máx del aislador contacto abierto 15mA 24V Máx resistencia en serie contacto cerrado 300 m ohm INSTALACIÓN Este equipo así como cualquier actividad asociada de cableado se debe...

Page 6: ...ionador Mando de panel Estado del LED Normal LED apagado Apagado intermitente ámbar si hay fallo de dispositivo Abierto LED apagado Ámbar encendido Normal LED encendido Rojo encendido Abierto LED encendido Rojo encendido Normal LED intermitente Verde intermitente ámbar si hay fallo del dispositivo Abierto LED intermitente Ámbar encendido Indicaciones del LED Estado de la pasarela Estado del LED Si...

Page 7: ...gleitungstrenner Max Gleichstrom Trenner geschlossener Schalter 0 9A Eingangsspannung 29V Max Schaltstrom Trenner 0 9A Eingangsspannung 29V Max Trennerstrom offen 15mA bei 24V Max Vorwiderstand geschlossenen 300mOhm INSTALLATION Dieses Gerät und alle verbundenen Verkabelungen müssen im Einklang mit allen sachbezogenen Normen und Vorschriften installiert werden Die Abbildungen 1 und 2 zeigen die In...

Page 8: ... allgemeinen Vorrang Isolatorstatus Panelbefehl LED Status Normal LED aus Aus gelbes Blinken bei Gerätestörung Offen LED aus Gelb an Normal LED an Rot an Offen LED an Rot an Normal LED blinkt Grünes Blinken gelb bei Gerätestörung Offen LED blinkt Gelb an RF Status LED Gateway Status LED Status Bedeutung Einschaltinitialisierung keine Störung Langer grüner Impuls Gateway ist nicht installiert Werks...

Page 9: ...A à 24V Résistance max série état fermé 300 MΩ INSTALLATION Cet équipement et son câblage doivent être réalisés conformément aux règlementations en vigueur Se reporter aux Figures 1 et 2 concernant l installation du socle B501 AP Pour plus d informations voir le document réf D550 33 00 Les dispositifs du système radio doivent être séparés par une distance minimum de 1m Système Antivol Le socle com...

Page 10: ... toutes les 1s Dérangement interne du dispositif Dispositif non programmé Double clignotement rouge bleu toutes les 14s ou juste en bleu en état de communication Dispositif alimenté et en attente de programmation Attente de programmation Double clignotement bleu rouge toutes les 14s ou juste en bleu en état de communication Information chargée dans l interface Attend commencement de programmation ...

Reviews: