D200-303-00
I56-3892-002
Pittway Tecnologica S.r.l. Via Caboto 19/3, 34147 TRIESTE, Italy
X 10
X 1
Figure 4: Rotary Address Switches
PROGRAMMING
A commissioning operation is necessary to associate the RF
gateway with its related RF devices. Commissioning the gateway
is performed using the M200WC-RF USB RF interface connected
to a PC running the appropriate software tools (see product code
M200SCT-RF for details). The data file created when the system
was designed is downloaded into the gateway and the gateway
uses this information to configure the RF system. The gateway
searches for all its associated RF devices and programmes them
with their network parameters; it then orchestrates the creation of a
fully functional RF mesh network. (For further information, see the
Radio Programming and Commissioning Manual
- ref. D200-
306-00.)
NOTE:
Do not run more than one interface at a time to
commission devices in an area.
NOTE: Batteries should not be fitted into RF devices until the
system commissioning time
Loop Status LED (Note: Panel command generally has priority)
Isolator State
Panel Command
LED State
Normal
LED off
Off (Amber blink if device fault)
Open
LED off
Amber on
Normal
LED on
Red on
Open
LED on
Red on
Normal
LED blink
Green blink (Amber if device fault)
Open
LED blink
Amber on
EN54-25: 2008 / AC: 2010 / AC: 2012
Components Using Radio Links
EN54-17: 2005 / AC: 2007 Short-Circuit Isolators
EN54-18: 2005 / AC: 2007 Input/Output Devices
for use in fire detection and fire alarm systems for buildings
0333 14
DOP-IRF001
Pittway Tecnologica S.r.l.
Via Caboto 19/3, 34147 Trieste, Italy
RF status LED
Gateway Status
LED State
Meaning
Power-on initialisation
(no fault)
Long Green pulse
Gateway is un-commissioned
(factory default)
3 Green blinks
Gateway is (pre-)commissioned
Fault
Blink Amber every 1s.
Gateway has an internal trouble
Un-commissioned
Red/Blue double-blink every 14s
(or just Blue when communicating).
Gateway is powered and is waiting to be
programmed.
Pre-commissioned
Blue/Red double-blink every 14s (or just
Blue when communicating).
Data has been downloaded into gateway,
waiting to begin RF network commissioning.
Commissioning
Blue/Green double-blink every 14s (or
just blue when communicating).
Gateway has started commissioning, but
complete RF network not yet created.
Sync
Blue/Amber double-blink every 14s
(or just Blue when communicating).
Trying to re synchronize the RF network
from Idle status.
Normal
Blue blink every 14s.
RF communications are established;
gateway and network working properly.
Network Fault
Amber/Blue double-blink every 14s
Gateway is experiencing an RF network
problem.
Recovery mode
Blue/Blue double-blink every 14s
RF network has one or more missing links
and gateway is trying to reconfigure them.
Patents Pending
LED INDICATORS AND FAULT DESCRIPTION
The Radio Gateway has two LED indicators:
LED1: Loop communications status
LED2 RF communications status
EU Declaration of Conformity
Hereby,
Life Safety Distribution GmbH declares
that the radio equipment type
M200G-RF
is in
compliance
with directive 2014/53/EU
The full text of the EU DoC can be requested from: