Slide the antenna bolts through the holes in the mounting bracket, then attach the
antenna to the bracket, using the provided three nuts and three lockwashers.
3
Using a plumb line or bubble level, ensure the antenna is within 5° of vertical
(perpendicular to the horizon), and tighten the mounting bracket bolts.
4
Bolt the lightning suppressor mounting plate to a flange that is attached to a valid
earth ground. The roof ring ground system, a Central Office grounding plate, and
building structural steel are examples of valid earth ground points. If the mounting
plate cannot be bolted to a valid earth ground, bolt the mounting plate to a point
within 15 ft of the chosen valid earth ground. If the mounting plate is to be
installed in a nonmetallic junction box, perform the installation, and bolt the
assembly near the chosen valid earth ground.
Procedure B. Roof Antenna Mounting and Cable Connection (cont’d)
Step
Procedure
Antenna
Mounting
(±5° of vertical)
Lock washers (3)
Bracket
Nuts (3)
Antenna Bolts (3)
090-72010-97
Summary of Contents for TimeSource 500
Page 1: ...TimeSource 3500 GPS Primary Reference Source 097 72050 01 Issue 7 August 2003 ...
Page 6: ...6 TimeSource 3500 Contents 097 72050 01 Issue 7 August 2003 ...
Page 161: ...4 Chapter TL1 Reference This chapter provides information for using the TL1 language ...
Page 271: ...6 Chapter Specifications This chapter provides equipment specifications ...
Page 297: ...Index ...