
2-1-8
L0604DCP
(5) Main PSU
A. Discharging
1) Points to be discharged
2) Voltage Rating and Discharge Time
- The Discharge Time means that the decay time from initial value of voltage to 10Vdc.
3) How to discharge
1. Connect Discharge Resistor(2.4k
Ω
/10W) between two pins while the Harness is connected.
2. Order of voltages to be discharged: Va
→
Vs
→
Vset
→
Vscan
→
Ve
→
PFC
CN8005
1-4 pin: Va discharge
CN8003
8-10pin: Vs discharge
5- 6 pin: Vset discharge
3- 4 pin: Vscan discharge
CN 8002
7-9 pin: Vs discharge
3-5 pin: Ve discharge
CN 8009
1-3 pin: PFC discharge
3. It is strongly recommended that the discharge is at least 15 seconds with 2.4k
Ω
/10W.
PFC
Vs
Va
Vset
Vscan
Ve
Voltage (Typical)
400V
175V
70V
173V
-60V
160V
Discharge Time By 2.4k
Ω
/10W
5sec
5sec
8sec
4sec
15sec
5sec
Main PSU
CN8003
CN8005
CN8009
CN8002
Pin 1
Pin 10
Pin 1
Pin 5
Pin 1
Pin 9
Pin 1
Pin 5
Vs,
Vscan,
Vset
Va
Vs,Ve
PFC
Summary of Contents for 6842PE M
Page 5: ...1 1 2 L0604SP DIMENSIONS 330 600 70 71 6 660 532 8 1054 934 9 115 58 57...
Page 48: ...1 9 21 Analog CBA Bottom View 1 9 22 BL0600F01011 1...
Page 49: ...1 9 23 1 9 24 Jack CBA Top View Jack CBA Bottom View BL0600F01011 2...
Page 50: ...Switch CBA Top View Switch CBA Bottom View 1 9 25 1 9 26 BL0600G04011 2...
Page 53: ...TP2022 WF4 TP2023 WF5 Digital CBA Bottom View 1 9 31 1 9 32 BL0600G04011 1...
Page 82: ...6842PE L0604UE 2004 09 21...