
G. Slide Installation.
1.
Position slide to determine proper location for stake.
2.
Drive wood stake into ground leaving 2'' exposed.
3.
Secure the slide bottom to the stake using (2) 1-1/4'' deck screws.
(Fig. 7)
.
2'' A
bov
e G
rou
nd
(2)
1-1/4'' screws
2'' x 4'' x 18''
Fig. 7
Tunnel Twister Assembly Instructions
10
Summary of Contents for Tunnel Twister
Page 11: ...11...