Section III: Operation
3.0.OPE.SL-75
PLACING A CONTAINER ON THE GROUND:
STEP 1.
MOVE THE SLIDING JIB ALL THE WAY BACK (LEFT CONTROL LEFT) UNTIL MECHANICAL JIB LATCHES
UNLOCK.
STEP 2.
TILT THE ARM BACKWARDS (RIGHT CONTROL LEFT). WHEN THE CONTAINER TOUCHES THE
GROUND, RELEASE THE BRAKES TO FREE THE TRUCK FOR FORWARD MOVEMENT CAUSED BY THE
CONTAINER
STEP 3.
ROTATE JIB ALL THE WAY BACK UNTIL THE CONTAINER TOUCHES THE GROUND. PULL AWAY FROM
CONTAINER AND ROTATE JIB BACK INTO THE TRANSPORT POSITION.
WARNING:
1. DON'T OVER SPEED THE PUMP 1,500 RPM
MAXIMUM.
2. DON'T DUMP, MOUNT OR DISMOUNT BODIES ON
UNEVEN GROUND.
3.
DON'T DRIVE WITH THE HOIST IN THE DUMP
POSITION OR WITH THE HOOK TILTED BACK.
3-3
Summary of Contents for SL-75
Page 2: ......
Page 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Page 28: ......
Page 32: ......
Page 36: ......
Page 56: ......
Page 57: ......
Page 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...