Section II: Installation
2.0.INS.SL-75
8.
The following connections will need to be made after installing the auxiliary AGM 27 or
AGM 31 battery inside of the Power Pack enclosure:
a. Red series parallel switch lead and red motor starter lead to the positive aux battery
terminal
b. Connection of the male connector of proximity sensor harness
(Pt. No. 13P61)
to the
valve solenoid harness
(Pt. No. 40P59)
.
c.
Connection of the female connector to the male connector of the switch box harness
d. Connection of the front positive series parallel flying lead to the positive terminal of
the fused positive terminal on the truck battery
e. Connection of the left side negative series parallel flying lead to the negative terminal
of the truck battery.
Cables entering the Power Pack enclosure should be routed up into the enclosure to
prevent moisture from following the cable into the enclosure. When this is not possible a
cable tie should be put on the cable or harness 1/2” from entering the enclosure to divert
moisture
.
9.
Route control harness from valve into the
truck cab. Determine the best location in
the cab for the switch box (
Pt. No. 22P87
)
location and install with mounting
screws (included). The location should
be such that the controls
can be easily reached
while operating the truck.
10.
Insert power adapter into 12V outlet
or hardwire to 12V battery. (
see
wiring diagram for hardwiring
)
11.
Route battery cables to
either the front of cab or
the closest battery
available. The Power
Pack requires 24 V to
function. An additional
battery will be required
during install.
2-9
Summary of Contents for SL-75
Page 2: ......
Page 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Page 28: ......
Page 32: ......
Page 36: ......
Page 56: ......
Page 57: ......
Page 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...