Section II: Installation
2.0.INS.SL-75
hoist as indicated in
Fig. B
. These dimensions are flexible because of possible interference
with chassis components. Also allow for mounting the Power Pack. You should consult the
truck chassis supplier for any limitations regarding drilling mount holes in the truck chassis
frame rails. Typically, the holes must be at least 2 3/4” from the top of the truck chassis rails
(reference
Fig. C, Fig. D & Fig. E
). Mid brackets will have more flexibility due to the
additional row of holes in the Main Frame and allows for drilling into the truck chassis frame
rails at 2 3/4”, 3 3/4” or 4 3/4”
(bolts are only required on two of the four lower mount
bracket holes).
Once the locations of the mount brackets have been determined, use the
mount brackets as a template for marking the mounting holes in the truck chassis frame
rails. Drill the 17/32” diameter holes required and attach the brackets to the truck chassis
with the 1/2” diameter bolts,
washers, and locking hex
nuts provided.
Torque to
110 ft.lb
.
3. Bolt the mount brackets to
the hoist main frame as
indicated on
Fig. C, D and E
.
You may need to modify the
mount brackets or add shim
plates to allow for variances
in the width of the truck
chassis as well as to allow
for top rivets, stepped
channels, etc.
Figure C
Figure D
Figure E
Figure C
2-3
Summary of Contents for SL-75
Page 2: ......
Page 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Page 28: ......
Page 32: ......
Page 36: ......
Page 56: ......
Page 57: ......
Page 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...