Section II: Installation
2.0.INS.SL-75
START UP PROCEDURE
1. Fill the hydraulic tank with hydraulic oil (see oil specification in Section IV: Maintenance.)
2. Operate the cylinders at full stroke five to ten times to bleed the air from the lines and
cylinders. The cylinders were filled with oil during testing at the factory, but some
seepage may have occurred during shipping and installation. Refill the hydraulic tank, if
needed, during this sequence and do not let the pump run without oil.
3. Check for leaks and tighten fittings as
necessary.
4. Verify the movement of the control levers
corresponds to the movement of the
cylinders per the figure below.
5. Install all safety decals and product
decals as shown on
Pg. 1-5
after final
installation and painting have been
completed.
6. Fill out the Product Registration form
online at https://www.swaploader.com/warranty-registration
NOTE:
FAILURE TO FILL OUT AND RETURN PRODUCT REGISTRATION WITHIN 15 DAYS OF INSTALLATION MAY POSSIBLY
VOID THE WARRANTY.
CAUTION The SwapLoader hoist must be used with bodies or containers that properly
fit the front hook and the rear hold-downs (see Subframe Critical Dimensions
on Pg. 2-12). If possible, pick up one of the containers that will actually be
used with the SwapLoader hoist and verify the following:
Outside dimensions of the long sills match the guiding rollers on the
hoist.
The front hook dimensions are correct for the hoist.
The rear hold-downs of the container latch into the hold-downs on
the hoist.
Check for any interference between the container and any part of the
hoist (i.e.: Hydraulic tank, hydraulic tubing or hose, hydraulic valve,
etc.)
2-14
Summary of Contents for SL-75
Page 2: ......
Page 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Page 28: ......
Page 32: ......
Page 36: ......
Page 56: ......
Page 57: ......
Page 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...