Section III: Operation
3.0.OPE.SL-
160
CHANGING HOOK HEIGHT: 36” TO 54” JIB HEIGHT ADJUSTMENT PROCEDURE
(cont’d)
STEP 4.
CONTINUE TO TILT TELESCOPIC ARM REARWARD UNTIL THE DUMP CYLINDERS ARE FULLY EXTENDED.
REPLACE LOCK PIN AND SECURE WITH HITCH PIN.
WARNING:
DO NOT REMOVE LOCK PIN ON THE ADJUSTABLE JIB WHILE JIB IS IN THE 36” HOOK POSITION AND
THE TELESCOPIC ARM IS TILTED REARWARD (AS SHOWN). POSSIBLE PROPERTY DAMAGE AND/OR
PERSONAL INJURY MAY RESULT.
3-5
Summary of Contents for SL-160
Page 2: ......
Page 38: ...This Page Intentionally Left Blank ...
Page 43: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 31 ...
Page 44: ...This Page Intentionally Left Blank ...
Page 48: ...This Page Intentionally Left Blank ...
Page 56: ...This Page Intentionally Left Blank ...
Page 70: ...This Page Intentionally Left Blank ...
Page 82: ...This Page Intentionally Left Blank ...
Page 93: ......
Page 94: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...