Section III: Operation
3.0.OPE.SL-
160
PLACING A CONTAINER ON THE GROUND:
STEP 1.
MOVE THE SLIDING JIB ALL THE WAY BACK (RIGHT CONTROL BACKWARD) UNTIL MECHANICAL JIB
LATCHES UNLOCK.
STEP 2.
TILT THE ARM BACKWARDS (LEFT CONTROL BACKWARD). WHEN THE CONTAINER TOUCHES THE
GROUND, RELEASE THE BRAKES TO FREE THE TRUCK FOR FORWARD MOVEMENT CAUSED BY THE
CONTAINER.
STEP 3.
ROTATE JIB ALL THE WAY BACK UNTIL THE CONTAINER TOUCHES THE GROUND. PULL AWAY FROM
CONTAINER AND ROTATE JIB BACK INTO THE TRANSPORT POSITION.
WARNING:
1. DON'T OVER SPEED THE PUMP 1,500 RPM
MAXIMUM.
2. DON'T DUMP, MOUNT OR DISMOUNT BODIES
ON UNEVEN GROUND.
3.
DON'T DRIVE WITH THE HOIST IN THE DUMP
POSITION OR WITH THE HOOK TILTED BACK.
3-3
Summary of Contents for SL-160
Page 2: ......
Page 38: ...This Page Intentionally Left Blank ...
Page 43: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 31 ...
Page 44: ...This Page Intentionally Left Blank ...
Page 48: ...This Page Intentionally Left Blank ...
Page 56: ...This Page Intentionally Left Blank ...
Page 70: ...This Page Intentionally Left Blank ...
Page 82: ...This Page Intentionally Left Blank ...
Page 93: ......
Page 94: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...