
10-14 SERVICING INFORMATION
1
Generator lead wire
9
Generator cover
2
Battery
-
terminal
*1 Pass the generator lead wire inside of the breather hose.
3
Clamp
*2 Contact the battery
-
terminal onto the crankcase.
4
Neutral switch
*3 Bent the oil seal retainer.
5
CKP sensor
*4
Pass the stator coil lead wire between the boss and rib.
Do not pinch the stator coil lead wire with the clamp, boss and rib.
6
Stator coil
7
Stator coil lead wire
*5
Do not pinch the stator coil lead wire with the boss of generator
cover and CKP sensor.
8
Clamp
0 ± 10˚
*2
*3
*5
*4
*1
160 N.m (16.0 kgf-m, 115.5 lbf-ft)
Summary of Contents for TU250X
Page 1: ......
Page 2: ......
Page 41: ...PERIODIC MAINTENANCE 2 23...
Page 369: ......
Page 370: ......