CHASSIS 5-28
NOTE:
When installing the front turn signal lights, insert the projec-
tion on the turn signal light bracket into the hole of steering
stem upper bracket.
• Install the handlebar left switch.
NOTE:
Insert the projection into the hole of the handlebars.
* Install the handlebar right switch.
NOTE:
* Apply SUZUKI SUPER GREASE "A" to the end of the
throttle cable.
99000-25010: SUZUKI SUPER GREASE "A"
*
Insert the projection into the hole of the handlebars.
• Install the master cylinder. (See p. 5-13.)
• Install the front brake caliper. (See p. 5-10.)
• Install the front fender and front wheel. (See pp. 5-6 and
-21.)
NOTE:
Hold the front fork legs, move them back and forth and
make sure that the steering is not loose.
A CAUTION
After performing the adjustment and installing the
handlebars, "rock" the front wheel assembly for-
ward and backward to ensure that there is no play
and that the procedure was accomplished correct-
ly. Finally, check to make sure that the steering
stem moves freely from left to right with its own
weight. If play or stiffeness is noticeable, re-adjust
the steering stem nut.
Downloaded from
www.Manualslib.com
manuals search engine
Summary of Contents for GZ250 Marauder
Page 1: ...Downloaded from www Manualslib com manuals search engine ...
Page 11: ...Downloaded from www Manualslib com manuals search engine ...
Page 26: ...replacement Downloaded from www Manualslib com manuals search engine ...
Page 33: ...2 17 PERIODIC MAINTENANCE Downloaded from www Manualslib com manuals search engine ...
Page 117: ...Left Right Downloaded from www Manualslib com manuals search engine ...
Page 154: ...Downloaded from www Manualslib com manuals search engine ...
Page 173: ... Faulty starter clutch Downloaded from www Manualslib com manuals search engine ...
Page 206: ...7 9 SERVICING INFORMATION FOR E 24 Downloaded from www Manualslib com manuals search engine ...
Page 211: ...Stator coil Downloaded from www Manualslib com manuals search engine ...