DF40QH / DF50QH
29
Rigging port grommet
• Install both side lower covers and rigging port grommet
1
.
• Push the cable seal tube
2
into the clearance between
shift / throttle cable
3
/
4
and rigging port grommet.
Harness/Cable routing
• Fix handle wire harness with clamp
a
as shown at right.
• Bind shift and throttle cable with spiral tube
b
as shown at
right.
a
b
Summary of Contents for DF 40
Page 1: ...99500 87J00 01E ...
Page 108: ......
Page 149: ...POWER UNIT 6 6 Remove eight bolts and nut Lift up and remove power unit from engine holder ...
Page 263: ...10 1 WIRE HOSE ROUTING WIRING DIAGRAM DF40T DF50T ...
Page 272: ... _ _ r ...
Page 279: ......
Page 367: ... ...
Page 369: ...99501 87J00 01E OUTBOARD MOTOR Printed in Japan TK ...