![Suzuki DF 40 Service Manual Download Page 103](http://html.mh-extra.com/html/suzuki/df-40/df-40_service-manual_1408856103.webp)
ENGINE CONTROL SYSTEM 3-48
REMOVAL
Prior to removing Flywheel :
• Disconnect battery cables from battery.
1. Remove flywheel cover.
2. Loosen flywheel bolt 2 – 3 turns.
09930-48720 : Flywheel holder
NOTE:
Do not remove flywheel bolt at this time.
This bolt prevents damage to the crankshaft when using fly-
wheel remover tools.
3. Using special tools, loosen flywheel from crankshaft.
09930-39411 : Flywheel remover
09930-39420 : Flywheel remover bolt
4. Remove flywheel bolt
1
, washer
2
, flywheel
3
and key
4
.
5. Remove screws
5
and CKP sensors
6
, then disconnect
CKP sensor connector.
z
z
1
2
3
4
6
5
6
6. Disconnect CMP sensor connector.
Remove bolt
7
and CMP sensor
8
.
Summary of Contents for DF 40
Page 1: ...99500 87J00 01E ...
Page 108: ......
Page 149: ...POWER UNIT 6 6 Remove eight bolts and nut Lift up and remove power unit from engine holder ...
Page 263: ...10 1 WIRE HOSE ROUTING WIRING DIAGRAM DF40T DF50T ...
Page 272: ... _ _ r ...
Page 279: ......
Page 367: ... ...
Page 369: ...99501 87J00 01E OUTBOARD MOTOR Printed in Japan TK ...