Chuckinspection protocol
4" Chuck
topside leveling pos.1 & 2
...0,022....mm
......../.......mm
concentric running
....0,004....mm
......./........mm
Vacuum-0,87bar
Remarks:
minimum vacuum: -0.80 bar
permissible deviation from topside leveling: 0,030mm
permissible deviation from concentric running: 0,030mm
Chuck partnumber: tool AK:
protocol number: 1/3
516903
200347
Order number:
testing tool:QS
Date:08.02.05 Name:Ga
accepted:
rework:
X
SMTL GmbH
Chuck inspection protocol
1 of 1, 08.02.2005
Summary of Contents for MicroTec Delta10TT
Page 1: ...2 www suss com MANUAL OPERATOR TECHNICAL DOCUMENTATION Spin Coater Delta10TT AK 200 347 ...
Page 40: ...MECHANICAL DRAWINGS AND PARTS LIST delta10 Rev00 dl 18 01 2005 7 2 7 2 Vacuum coupling ...
Page 42: ...2 www suss com TECHNICAL DOCUMENTATION Spin Coater Delta10TT AK 200 347 ...
Page 43: ...2 dl 2005 01 TECHNICAL DOCUMENTATION Electrical Schematics ...