background image

9

Manual 19“ HVPS-HC Module

19“ HVPS-HC Module R012 Manual | Surface Concept GmbH

4   Device Layout & Operation

4.1  Device Layout

The layout of the 19” HVPS-HC Module R012 is given below.

SHV connector for output of operation 

voltage with positive polarity for the first/ 

second HV channel.

(Must be terminated to GND or to an external 

reference potential when using the output 

voltage with negative polarity.

Check the specification sheet for the 

maximum allowed reference voltage).

SHV connector for output of operation 

voltage with negative polarity for the first/ 

second HV channel.

(Must be terminated to GND or to an external 

reference potential when using the output 

voltage with positive polarity.

Check the specification sheet for the 

maximum allowed reference voltage).

Figure 2: Layout of the 19” HVPS-HC Module R012.

1(+)/2(+)

1(-)/2(-)

Summary of Contents for HVPS-HC

Page 1: ...19 HVPS HC Module 1Channel 2Channel Release R012 Manual...

Page 2: ...HVPS HC Module R012 Manual Surface Concept GmbH Surface Concept GmbH Am Saegewerk 23a 55124 Mainz Germany phone 49 6131 62716 0 fax 49 6131 62716 29 email info surface concept de web www surface conc...

Page 3: ...ral Information 5 2 2 Safety Instructions 5 2 3 General Overview 6 3 Introduction 7 3 1 Initial Inspection 7 3 2 Installation 7 4 Device Layout Operation 9 4 1 Device Layout 9 4 2 General Device Opera...

Page 4: ...4 19 HVPS HC Module R012 Manual Surface Concept GmbH T h i s s i d e h a s b e e n l e f t b l a n k o n p u r p o s e...

Page 5: ...he cautionsymbol markswarnings whicharegiventopreventanaccidentaldamaging of the device Do NOT ignore these warnings and follow them strictly Otherwise no guarantee is given for arose damages Note The...

Page 6: ...arity Depending on the maximum output voltage the 19 HVPS HC Module R012 comes with either SHV connectors maximum output voltage 5kV or with 10kV LEMO connectors type ERA 1S 405 CTL maximum output vol...

Page 7: ...damage please contact SURFACE CONCEPT immediately Please check the delivery according to the packing list see Table 1 for completeness 1x 19 HVPS HV Module R012 1x Termination Plug SHV or LEMO 1S per...

Page 8: ...nput of the 19 HVPS HC Module R012 With a missing reference potential the device is not providing any output voltage Finish the complete cabling of the 19 HVPS HC Module R012 before switching on the 1...

Page 9: ...NDortoanexternal reference potential when using the output voltage with negative polarity Check the specification sheet for the maximum allowed reference voltage SHV connector for output of operation...

Page 10: ...annel control knob After switching on the high voltage the device is in the so called operation mode In operation modethedisplayshowsthenameoftheselected channel in the top line in this case HV 1 as w...

Page 11: ...nter clockwise while pushing it to increase decrease the step width in the line edit step Push the Start Standby button in the lower left corner of the display again to switch back to the Standby mode...

Page 12: ...and on the polarity of the output voltages of the both HV modules e g the pulling up effect is much stronger for different polarities between the both modules then when both polarities are the same 4...

Page 13: ...should be larger than the current flow out of the floating HV module a typical resistance values for the floating operation of MCP based detectors is 10MOhms External resistances in a compact housing...

Page 14: ...14 19 HVPS HC Module R012 Manual Surface Concept GmbH T h i s s i d e h a s b e e n l e f t b l a n k o n p u r p o s e...

Page 15: ...igure 5 Operation mode voltage adjustment 10 Figure 6 Schematic layout of the 19 HVPS HC Module R012 11 Figure 7 Connection scheme for floating operation of one HV channel of Module R012in respect to...

Page 16: ...dards or other normative documents where relevant EN 61000 6 2 2005 AC 2005 Electromagnetic compatibility EMC Generic standards Immunity for industrial environments EN 61000 6 4 2007 A1 2011 Electroma...

Reviews: