Chapter 5: Advanced Serverboard Setup
5-7
4. Repeat steps 1 and 2 to install a second Itanium2 CPU (w/ power pod) as
needed.
Securing the power pod with four M3 screws.
3. Locate four of the M3 screws in the VRM-008 package and use them to secure
the power pod onto the serverboard as shown in the picture below. (Recom-
mended torque: not to exceed 2.5 in-lbf.)
Figure 5-2. Dual Itanium2 CPUs with Power Pods Installed
Summary of Contents for SuperServer 6113M-i
Page 1: ...SUPERSERVER 6113M i USER SMANUAL 1 0 SUPER...
Page 5: ...v Preface Notes...
Page 10: ...SUPERSERVER 6113M i User s Manual x Notes...
Page 18: ...SUPERSERVER 6113M i User s Manual 1 8 Notes...
Page 28: ...SUPERSERVER 6113M i User s Manual 2 10 Notes...
Page 69: ...Chapter 6 Advanced Chassis Setup 6 9 Figure 6 4 Removing Replacing the Power Supply...