Chapter 2: Server Installation
2-1
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 6025B-TR+/
6025B-8R+ up and running. Following these steps in the order given should enable
you to have the system operational within a minimum amount of time. This quick
setup assumes that your system has come to you with the processors and memory
preinstalled. If your system is not already fully integrated with a serverboard, pro-
cessors, system memory etc., please turn to the chapter or section noted in each
step for details on installing specifi c components.
2-2 Unpacking the System
You should inspect the box the SuperServer 6025B-TR+/6025B-8R+ was shipped
in and note if it was damaged in any way. If the server itself shows damage you
should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the SuperServer
6025B-TR+/6025B-8R+. It should be situated in a clean, dust-free area that is well
ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are
generated. You will also need it placed near a grounded power outlet. Read the
Rack and Server Precautions in the next section.
2-3
Preparing for Setup
The box the SuperServer 6025B-TR+/6025B-8R+ was shipped in should include
two sets of rail assemblies, two rail mounting brackets and the mounting screws
you will need to install the system into the rack. Follow the steps in the order
given to complete the installation process in a minimum amount of time. Please
read this section in its entirety before you begin the installation procedure outlined
in the sections that follow.
Summary of Contents for SUPERSERVER 6025B-8R+
Page 1: ...SUPERSERVER 6025B TR SUPERSERVER 6025B 8R SUPER USER S MANUAL 1 0b...
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 6025B TR 6025B 8R User s Manual...
Page 21: ...Chapter 2 Server Installation 2 5 Figure 2 1 Installing Chassis Rails...
Page 23: ...Chapter 2 Server Installation 2 7 Figure 2 2 Installing the Server into a Rack...
Page 25: ...Chapter 2 Server Installation 2 9 Figure 2 3 Accessing the Inside of the System...
Page 30: ...SUPERSERVER 6025B TR 6025B 8R User s Manual 3 4 Notes...
Page 96: ...A 6 SUPERSERVER 6025B TR 6025B 8R User s Manual Notes...
Page 102: ...B 6 SUPERSERVER 6025B TR 6025B 8R User s Manual Notes...
Page 116: ...C 14 SUPERSERVER 6025B TR 6025B 8R User s Manual Notes...
Page 120: ...D 4 SUPERSERVER 6025B TR 6025B 8R User s Manual Notes...