Chapter 2: Server Installation
2-5
Figure 2-2. Installing Chassis Rails
Installing the Chassis Rails
Position the fixed chassis rail sections you just removed along the side
of the 6024H-8R/6024H-i making sure the screw holes line up. Note
that these two rails are left/right specific. Screw the rail securely to the
side of the chassis (see Figure 2-2). Repeat this procedure for the other
rail on the other side of the chassis. You will also need to attach the rail
brackets when installng into a telco rack.
Locking Tabs:
As mentioned, both chassis rails have a locking tab, which
serves two functions. The first is to lock the server into place when installed and
pushed fully into the rack, which is its normal position. Secondly, these tabs
also lock the server in place when fully extended from the rack. This prevents
the server from coming completely out of the rack when you pull it out for
servicing.
Summary of Contents for SuperServer 6024H-8R
Page 1: ...SUPERSERVER 6024H 8R SUPERSERVER 6024H i USER SMANUAL 1 0 SUPER NIC 1 NIC 2...
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 6024H 8R 6024H i Manual...
Page 25: ...Chapter 2 Server Installation 2 9 Figure 2 5 Accessing the Inside of the System P4D P6 UP ER S...
Page 30: ...SUPERSERVER 6024H 8R 6024H i User s Manual 3 4 Notes...
Page 58: ...5 24 SUPERSERVER 6024H 8R 6024H i Manual Notes...
Page 94: ...7 24 SUPERSERVER 6024H 8R 6024H i Manual Notes...
Page 100: ...A 6 SUPERSERVER 6024H 8R 6024H i Manual Notes...
Page 124: ...C 4 SUPERSERVER 6024H 8R 6024H i Manual Notes...