Chapter 2: Server Installation
2-11
Your 1025C-M3 server system may have come with system memory already
2.
installed. Make sure all DIMMs are fully seated in their slots. For details on
adding system memory, refer to Chapter 5.
If desired, you can install add-on cards to the system. See Chapter 5 for
3.
details on installing PCI add-on cards.
Make sure all power and data cables are properly connected and not block-
4.
ing the chassis airfl ow. See Chapter 5 for details on cable connections. Also,
check the air seals for damage. The air seals are located under the blower
fan and beneath the frame cross section that separates the drive bay area
from the serverboard area of the chassis.
2-6 Checking the Drive Bay Setup
Next, you should check to make sure the hard drives have been properly installed
and all connections have been made.
Checking the Drives
Hard drives can be serviced without removing the top chassis cover.
1.
If you need to remove or install hard drives, please refer to Chapter 6.
2.
Checking the Airfl ow
Airfl ow is provided by four 4-cm fans. The system component layout was
1.
carefully designed to direct suffi cient cooling airfl ow to the components that
generate the most heat.
Note that all power and data cables have been routed in such a way that they
2.
do not block the airfl ow generated by the fans.
Providing Power
The last thing you must do is to provide input power to the system. Plug the
1.
power cord from the power supply unit into a high-quality power strip that of-
fers protection from electrical noise and power surges. It is recommended that
you use an uninterruptible power supply (UPS).
Finish by depressing the power button on the chassis control panel.
2.
Summary of Contents for SuperServer 1025C-M3
Page 1: ...SUPER USER S MANUAL Revision 1 0 SUPERSERVER 1025C M3...
Page 5: ...v Preface Notes...
Page 10: ...SUPERSERVER 1025C M3 User s Manual x Notes...
Page 23: ...Chapter 2 Server Installation 2 7 Figure 2 4 Installing the Outer Rails to the Rack 2 3 3...
Page 28: ...2 12 SUPERSERVER 1025C M3 Manual Notes...
Page 32: ...3 4 SUPERSERVER 1025C M3 Manual Notes...
Page 69: ...Chapter 6 Advanced Chassis Setup 6 7 Figure 6 5 Installing a DVD ROM Drive...
Page 71: ...Chapter 6 Advanced Chassis Setup 6 9 Figure 6 6 Removing Replacing the Power Supply...
Page 72: ...6 10 SUPERSERVER 1025C M3 Manual Notes...
Page 100: ...A 6 SUPERSERVER 1025C M3 User s Manual Notes...
Page 106: ...B 6 SUPERSERVER 1025C M3 User s Manual Notes...
Page 110: ...C 4 SUPERSERVER 1025C M3 User s Manual Notes...