Figure 2-2. Installing the Server into a Rack
(with optional front bezel shown)
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-2.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click".
Summary of Contents for SuperServer 1012G-MTF
Page 1: ...SUPER SUPERSERVER 1012G MTF USER S MANUAL Revision 1 0...
Page 5: ...v Preface Notes...
Page 16: ...1 6 SUPERSERVER 1012G MTF User s Manual Notes...
Page 30: ...3 4 SUPERSERVER 1012G MTF User s Manual Notes...
Page 64: ...5 30 SUPERSERVER 1012G MTF User s Manual Notes...
Page 72: ...6 8 SUPERSERVER 1012G MTF User s Manual Notes...
Page 90: ...A 2 SUPERSERVER 1012G MTF User s Manual Notes...