Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The
next step is to install the server into the rack. Do this by lining up the rear of the
chassis rails with the front of the rack rails. Slide the chassis rails into the rack
rails, keeping the pressure even on both sides (you may have to depress the lock-
ing tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumb screws that hold
the front of the server to the rack.
Summary of Contents for Dual Processor AS 1020C-3
Page 1: ...AS 1020C 3 USER S MANUAL 1 0 ...
Page 5: ...v Preface Notes ...
Page 10: ...AS 1020C 3 User s Manual x Notes ...
Page 30: ...3 4 AS1020C 3 User s Manual Notes ...
Page 62: ...5 28 AS1020C 3 User s Manual Figure 5 8 Array Configuration Utility Screen ...
Page 74: ...6 10 AS1020C 3 User s Manual Figure 6 6 Removing Replacing the Power Supply ...
Page 92: ...7 18 AS1020C 3 User s Manual Notes ...
Page 94: ...A 2 AS1020C 3 User s Manual Notes ...
Page 102: ...B 8 AS1020C 3 User s Manual Notes ...
Page 106: ...C 4 AS1020A T User s Manual Notes ...