background image

© 2020

Step 1 of 1

Order #56343

Locked layer contains

placeholder marks.

Completed Assembly

Light Box

Infill

Infill

Infill

3

1A

1

Transformer

6

M10 Bolt

M8 Bolt

6A

2

2A

4

4

Item

1,1A

2,2A

3

4

5

6,6A

Qty.

1,1

1,1

1

2

2

1,1

Description

46” CEI110 Horizontal Extrusion

40” CEI110 Vertical Extrusion

40” S44 Vertical Extrusion

19.189” Z31 Horizontal Extrusion

19.189” Z33 Horizontal Extrusion

Base Plate

Steps:

1) Assemble extrusions [1] [1A] [2] and [2A] flat on floor. See CEI110

    Tool-Less Assembly sheet.

2) Attach base plates [6] to horizontal [1], using M10 bolt washer and wing

    nut. Attach base plate [6A] to vertical [3], using M8 bolt.

    

Note: Base plate [

6A

] stays attached to [

3

], when packing.

3) Connect horizontals [4] and [5] to vertical [2A]. Tighten locks to secure.

4) Insert Infills between horizontals [4] and [5], then secure with vertical [3].

5) Connect lighting power cords and attach transformer.

    See 

Light Connection

 details.

6) Apply SEG graphic to front and blocker fabric to back of assembled Light Box.

    See General Information sheet for SEG Graphic Installation detail.

+

+

+

-

-

-

to power

Lights

Male

Male

Female

Female

Transformer

96W / 4A / 24V

Light to Light Connection

Light to Transformer Connection

Maximum of 7 light bars per transformer.

5

5

Power

Break

Power

Break

Keep base plate [

6A

] attached to vertical [

3

], when packing.

VK-0004 Assembly

Summary of Contents for VK-0004

Page 1: ...2020 Order 56343 Top View Perspective View VK 0004 Supernova If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP INSTRUCTIONS ...

Page 2: ...ailed explanation for assembly WARNING Cleaning Packing For Cleaning Metal Plex Laminate Parts Use a MILD NON ABRASIVE cleanser and soft cloth paper towel to clean all surfaces Keep exhibit components away from heat and prolonged sun exposure Heat and UV exposure will warp and fade components Retain all provided Packing Materials All provided packing materials are for ease of repacking component p...

Page 3: ...o channels Allows for proportional fit around the perimeter of the extrusion 3 Working from center to corner slide silicon edge on graphic into channel 4 After all edges of graphic have been inserted into channels step back and assess graphic fit make adjustments where needed 4 1 3 2 Fold edges over Insert into groove of frame SEG Installation ...

Page 4: ... connectors 1 Place extrusions end to end 2 Loosen all knobs then slide straight connectors across the seam of extrusions Disassembly 1 Loosen all knobs 2 Slide connectors off of one extrusion 3 Tighten knobs to prevent loss during packing shipping CEI110 Profile Slide both connectors across seam of extrusions Tighten all knobs Corner Connection 3 Tighten all knobs to secure connection Disassembly...

Page 5: ... 2020 Case 1 of 1 Order 56343 3 1 1A 2 2A 4A 4A 4 4 Graphics Setup Hardware Top View of Each Level Level 1 Bottom Level Level 2 Level 3 Infill Infill Infill 5 5 Case Packing ...

Page 6: ... base plate 6A to vertical 3 using M8 bolt Note Base plate 6A stays attached to 3 when packing 3 Connect horizontals 4 and 5 to vertical 2A Tighten locks to secure 4 Insert Infills between horizontals 4 and 5 then secure with vertical 3 5 Connect lighting power cords and attach transformer See Light Connection details 6 Apply SEG graphic to front and blocker fabric to back of assembled Light Box S...

Reviews: