Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack
itself should be grounded. Particular attention should be given to power supply
connections other than the direct connections to the branch circuit (i.e. the use of
power strips, etc.).
2-5 Installing the System into a Rack
This section provides information on installing the SC808 chassis into a rack unit
with the rails provided. There are a variety of rack units on the market, which
may mean the assembly procedure will differ slightly. You should also refer to the
installation instructions that came with the rack unit you are using.
NOTE:
This rail will fi t a rack between 26" and 33.5" deep.
Warning:
Do not pick up the server with the front handles. They are designed
to pull the system from a rack only.
Stability Hazard:
The rack stabilizing mechanism must be in place, or the
rack must be bolted to the fl oor before you slide the unit out for servicing. Failure to
stabilize the rack can cause the rack to tip over.
Warning:
Slide rail mounted equipment is not to be used as a shelf or a work
space.
Identifying the Sections of the Rack Rails
The chassis package includes two rack rail assemblies in the rack mounting kit.
Each assembly consists of two sections: an inner fi xed chassis rail that secures
directly to the server chassis and an outer fi xed rack rail that secures directly to
the rack itself (Figure 2-1).
Summary of Contents for SUPERSERVER 6018TR-T
Page 1: ...SUPERSERVER 6018TR T 6018TR TF USER S MANUAL Revision 1 0...
Page 5: ...v SUPERSERVER 6018TR T TF User s Manual Notes...
Page 10: ...x Notes SUPERSERVER 6018TR T TF User s Manual...
Page 84: ...5 32 SUPERSERVER 6018TR T TF User s Manual Notes...
Page 98: ...6 14 SUPERSERVER 6018TR T TF User s Manual Release Tab Figure 6 14 Changing the Power Supply...
Page 140: ...A 2 SUPERSERVER 6018TR T TF User s Manual Notes...