Chapter 2: Server Installation
2-1
Chapter 2
Server Installation
This chapter provides instructions for preparing and mounting your chassis in a rack.
2-1 Unpacking the System
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with the carrier
who delivered it.
2-2 Preparing for Setup
Decide on a suitable location for the rack unit that will hold your chassis. It should
be a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical
noise and electromagnetic fields are generated. A nearby grounded power outlet.
is required
The box your chassis was shipped in should include two sets of rail assemblies, two
rail mounting brackets and the mounting screws to mount the system into the rack.
Please read this chapter in its entirety before beginning the installation procedure.
Choosing a Setup Location
•
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
•
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and access for servicing.
•
It should be a restricted access location, such as a dedicated equipment room
or a service closet.
Summary of Contents for SUPERSERVER 2048U-RTR4
Page 1: ...USER S MANUAL Revision 1 0b SUPERSERVER 2048U RTR4 ...
Page 7: ...7 Appendix A BIOS Error Beep Codes A 1 Appendix B System Specifications B 1 ...
Page 8: ...8 Notes ...
Page 14: ...1 6 SUPERSERVER 2048U RTR4 User s Manual Notes ...
Page 28: ...SuperServer 2048U RTR4 User s Manual 3 6 Notes ...
Page 48: ...4 20 SUPERSERVER 2048U RTR4 User s Manual Notes ...
Page 90: ...6 16 SUPERSERVER 2048U RTR4 User s Manual Notes ...
Page 134: ...7 44 SuperServer 2048U RTR4 User s Manual Add an Attempt Delete Attempts Change Attempt Order ...
Page 148: ...A 2 SUPERSERVER 2048U RTR4 User s Manual Notes ...