4-6 Installation Step 5: Installing the Air Shroud
Air shrouds concentrate airflow to maximize fan efficiency. The SC933 chassis air
shroud does not require tools to set up.
Figure 4-4: Air Shroud for SC933 Chassis
To install the air shroud
1. If necessary, remove the rear fan by pressing the fan release tab and pulling the
fan from the chassis.
2. Move the cables from the power supply and power distributor to the bottom of
the chassis. You may have to bind the cables together.
3. Slide the air shroud extension into the groove behind the fan closest to the power
supply. The extension should almost touch the side of the chassis.
4. Slide the air shroud into the chassis. The air shroud connects to the air shroud
extension, the two front fans, and two rear fans.
Rear Fans
Air Shroud
Air Shroud
Extension
Summary of Contents for Supero SC933E1-R760B
Page 4: ...SC933 Chassis Manual iv Notes ...
Page 6: ...SC933 Chassis Manual vi Notes ...
Page 10: ...SC933 Chassis Manual x Notes ...
Page 14: ...SC933 Chassis Manual 1 4 Notes ...
Page 32: ...SC933 Chassis Manual 4 10 Figure 4 5 Placing the System Fan ...
Page 36: ...SC933 Chassis Manual 4 14 Notes ...
Page 43: ...5 7 Chapter 5 Rack Installation Figure 5 4 Installing the Outer Rails to the Server Rack ...
Page 46: ...xxx Chassis Manual 2 Notes ...
Page 52: ...SC933 Chassis Manual B 2 Notes ...