A+ Server AS -1114S-WTRT User's Manual
28
10. Place and re-screw the screws in the reverse order to the way you removed them (holes
1-2-3 in order). When finished, the force frame will be secure over both the rail frame
and CPU package..
Caution:
The screw tightening sequence of 1-2-3 must be executed in the proper sequence to
avoid catastrophic damage to the socket or CPU package.
Figure 3-8. Securing the Force Frame
Screw 1
Screw 3
Screw 2
Figure 3-9. The Force Frame Secured