10
OPERATING INSTRUCTIONS
Fig. A CLOUD 9 SMOKER Remote Control Timers
WARNING
BURN HAZARD – The cloud 9 smoker output NOZZLE reaches high temperature – AVOID CONTACT EVEN AFTER
SHUT DOWN.
To power on the unit, the following sequence must be observed:
•
Connect the SUPER VAC CLOUD 9 SMOKER to a 110 Vac power outlet and turn on the main power switch located
on the side of the unit near the A.C. cord.
•
Turn on the (on) switch on the remote control timer, the red led will come on indicating that the unit is powered, the
yellow led will also come on indicating that the first heating cycle has started. This should take a maximum of 10
minutes.
•
Now open the gas cylinder and adjust the regulator to a minimum of 10 psi, the “ready” condition will be indicated by
the green led which will come on when the pre-set temperature is reached; at this stage, the yellow led will go off and
the initial Auto Clean Cycle (ACC) will be automatically triggered.
•
After this initial cleaning cycle, which will take approximately 30 seconds, the unit will be ready to produce smoke.
•
The smoke output is adjustable by increasing or decreasing the pressure on the CO
2
or N
2
gas regulator (10 to 40 psi).
The operating temperature of the unit is maintained within a narrow margin the yellow led (heat) will turn on and off from time
to time to indicate heat on and heat off.
If two of the three electronic fail-safe systems (namely, the over-heating or the internal temperature limit) is
detected, the smoke production will stop and the yellow led will start blinking indicating a fail mode.
Immediately turn
off the unit, wait 4 to 5 minutes and retry the unit. If the fail mode reappears, disconnect the unit and contact SUPER VAC.
Smoke production will continue as long as all control parameters are within specifications. When the smoke on
signal is turned off, the ACC (Auto Clean Cycle) is automatically triggered to clean the heating block.