SUP’AIR manufactures its products in Europe. Most of the components used are Made in Europe.
S
UP’AIR
_
S
KYPPER
FR
Page 14
Installing the reserve parachutes
Thank you for care-
fully reading the
following! We advise
you to have the initial
rescue parachute
installation done by
someone knowled-
geable with the
process.
Insert the reserve parachute in its receiving
pocket with the flaps extented outward. The
handle must be pointing upward.
Push the reserve parachute risers through
the risers guiding sleeve ( the risers must be
positioned behind the parachute ).
Push the cord through the elasti-
cated loop 1.
Push the cord through grommet
2.
Still using the cord, push the elasti-
cated loop 5 through grommet 6.
Installing the reserve parachutes in their respective pockets.
Right handed pilots will install and connect
the left reserve parachute first. The reverse
will apply to left handed pilots.
POD, handle pointing upward.
Reserve risers beneath the
POD, guided through the
sleeve to the shoulders. The
shoulder connection should
preferably be made last.
Extendable flaps.
Push the cord through grommet
3.
Push the cord through grommet 4, and insert
the yellow handle cable in the loop. Carefully
remove the cord, and tuck away the end of
the handle under the outer end pockets.
Push the cord through grommet 7.
Push cord through grommet 8. Insert
the yellow handle cable in the loop.
Carefully remove the cord.
Tuck away the end of the handle
under the outer end pockets.
1
8
2
3
4
5
7
6