Commissioning
40
PT 30k to PT 33k
1 DC load break switch
The operating LED lights up in accordance with the operating state.
The commissioning menu opens when the unit is connected for the first
time.
Switching off
1.
Open the grid connection by switching off the circuit breaker.
2.
Disconnect the solar generator side by opening the DC load break switch
(switch position 0).
5.2
Commissioning
The commissioning menu comes up automatically when the unit is connected
for the first time. It helps you make the standard settings.
NOTE
For a better understanding of keyboard operation, please also see the chapter
Operation.
The procedure for commissioning the system as a
single unit
and as a master and slaves with several networked units
is described in detail below.
Please note:
NOTE
Once the system has been commissioned, the country can no longer be changed
via the menu. To change the country retrospectively, please contact the Techni-
cal Hotline on Tel +49 (0)7531 99677 77-577.
Commissioning single unit
System with one inverter
1.
During initial start-up the following appears on the display:
Begin commissioning with
.
Single device
p
h
o
t
o
v
o
l
t
a
i
k
f
o
r
u
m
.
c
o
m
Summary of Contents for PT 30k
Page 2: ...p h o t o v o l t a i k f o r u m c o m...
Page 3: ...p h o t o v o l t a i k f o r u m c o m...
Page 6: ...Introduction 4 PT 30k to PT 33k p h o t o v o l t a i k f o r u m c o m...
Page 8: ...6 p h o t o v o l t a i k f o r u m c o m...
Page 48: ...Commissioning 46 PT 30k to PT 33k p h o t o v o l t a i k f o r u m c o m...