6. COMMISSIONING
6.1. Start-Up / Shutdown Procedure
The inverter must be installed by a qualified / licensed electrical engineer in accordance to the
countries wiring regulations.
Before switching on, the installation engineer must have completed the Earth Bond, RCD and
earth leakage tests, checked that the solar panel Voc voltage does not exceed 480V and
checked the battery voltage.
Power ON Sequence:
1. Switch on AC
2. Press Start Button
3. Switch on Battery and battery breaker
4. Switch on the DC (PV Isolator)
Shutdown Sequence:
1. Switch off AC
2. Press the start button
3. Switch off the battery and the battery breaker
4. Switch off the DC (PV isolator)
Summary of Contents for SUNSYNK-8K-SG01LP1
Page 9: ...2 1 Product Size Page 9 Hybrid Inverter Installer Manual Inverter Size...
Page 16: ...Page 16 Hybrid Inverter Installer Manual 4 5 Function Port Definition...
Page 20: ...Page 20 Hybrid Inverter Installer Manual...
Page 22: ...Page 22 Hybrid Inverter Installer Manual 4 9 1 Recommended AC Surge Protector...
Page 28: ...Page 28 Hybrid Inverter Installer Manual 4 13 Wiring System for Inverter...
Page 29: ...Page 29 Hybrid Inverter Installer Manual...
Page 34: ...03 02 01 Page 34 Hybrid Inverter Installer Manual...
Page 37: ...Page 37 Hybrid Inverter Installer Manual 4 19 2 Connected to a Generator 03 02 01...