FORM NO. 660868 REV. B
PAGE 19
2-I
Install Cross Beam
Steps:
1. Apply anti-seize to all bolt threads before installing nuts.
2. Attach both ends of cross beam assembly to the arms as shown with nuts and
bolts.
3. Properly torque all nuts on cross beam gussets.
4. With the
SwiftShield™
in the covered position (roller aft), check level of hydraulic
fluid reservoir in control box. The hydraulic fluid level should be within 2 inches of
top. Add
SunFluid
™
as necessary.