FORM NO. 660868 REV. B
PAGE 13
Steps:
1. ABC-U Mechanism is installed inboard of guides.
2. For
FL10
Locate aft clamp 45.5” from top of guide. Locate forward clamp 31.5”
from top of guide.
3. For
FL6
Locate aft clamp 44” above float. Locate forward clamp 54” above float.
* This can be adjusted later if needed.
* For non Float Lifts, determine height accordingly.
4.
Slide side rail through cover mechanism with 2” spaced holes aft.
5. Fasten forward clamp to end hole.
6. Fasten aft clamp to closest hole on side rail.
FL10
: Position side rail inboard of clamp plate.
FL6
: Position side rail between clamp plate and guide.
7. Repeat on opposite side.
2-C
Install Side Rails with Side Rail Clamps
6.
FWD
Side Rail
2” spaced holes
Cover Mechanism
FWD Guide
Clamp
FL10: 31.5”
FL6: 54”
FL10: 45.5”
FL6: 44”
Clamp
FL6
Inboard
FL10
Inboard
Side Rail
Angled
Guide
Clamp
Side Rail
Clamp
Plate
Clamp
Guide
Clamp
Plate