#24 d8* 20*2*R16 4PCS
11
11
26R
26L
29R
29L
24
25
25
24
23
23
#11 d8 4PCS
STEP 6:
Insert the left and right
Handlebars (No. 26L
&
No. 26R)
into the tops of left and right
Swing Rods (No. 29L
&
No. 29R)
. Fix using 4
Bolts (No. 23)
, 4
Arc Washers (No. 24)
, 4
Spring Washers (No.11) and 4
Nuts (No. 25)
, tighten and secure with
Spanner (No. 62)
.
12