7 Commissioning
User Manual
50
If the Country selected does not have the “Grid codes” directives, this
configuration will not affect the following procedures.
However, you may select the MV to enable/disable the LVRT function
regardless of the country selected.
Step 8
After configuring the Grid Code, there will
be a “Pro-param” type selection screen and
then corresponding sub-menu will come
up. For detailed information, please refer to
“10.11 Protective Parameters Setting”.
Step 9
According to the actual
PV strings
configuration mode, choose the same
mode in the inverter by the LCD display
menu (see “10.13 PV Configuration Mode
Setting”).
Step 10
After configuring all parameters, there
will be a “setting confirmation” screen.
Check whether all above-mentioned
parameters are correct. Confirm by
Pressing
ENTER
. Cancel by
Pressing
ESC
and reset.
Step 11
Inverter will enter into startup process.
Observe status of LED indicators and the
LCD main screen. If inverter‘s
commissioning succeeds, the “RUN”
indicator will be lit and “RUN” will be
displayed on the “State” area.
If inverter’s commissioning fails, the “FAULT” indicator will be lit and “fault” will occur
on the display.
Press
j
to view “current fault” information. Remove the existing
malfunction and then repeat starting up inverter as the above procedures.