Chapter 2
Hardware Installation and Service
2-11
10. Install the Sun Netra CP3250 blade server into the front of the ATCA shelf in
the corresponding slot.
See
Section 2.2.3.2, “Installing the Blade Server Into the Shelf” on page 2-11
for
instructions.
2.2.3.2
Installing the Blade Server Into the Shelf
Note –
You can install the Sun Netra CP3250 blade server in any available slot in the
ATCA shelf except for slots 7 and 8.
1. If you have installed an advanced rear transition module (ARTM), go to the
front of the system and locate the corresponding slot number of the ARTM.
2. Remove the filler panel from the blade server slot, if necessary.
The filler panel is secured to the card cage using two screws, one at the top of the
filler panel, the other at the bottom. Store the filler panel in a safe place; you
might need to use it again if you remove a blade server for an extended time.
3. Prepare the Sun Netra CP3250 blade server by opening the injector/ejector
latches.
4. Carefully align the edges of the blade server with the guides in the appropriate
slot.
Look into the enclosure to verify correct alignment of the rails in the guides.
5. Keep the blade server aligned in the guides and slide the blade server in until
the injector/ejector latches engage the card cage.
6. Push the blade server slightly into the backplane connectors and close the
latches to seat the blade server in the connectors (
FIGURE 2-3
).
Push the upper latch lever to engage the blade server. When the upper and lower
levers are engaged properly, the blue Hot-Swap LED blinks while the blade server
is initializing. The blue LED turns off and the green OK LED lights when the
blade server is ready for use.
Note –
If the hot-swap LED does not light, then wiggle and push the latch so it
engages the hot-swap switch.
Summary of Contents for Sun Netra CP3250
Page 8: ...viii Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 12: ...xii Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 18: ...xviii Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 34: ...1 16 Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 70: ...2 36 Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 72: ...3 2 Sun Netra CP3250 Blade Server User s Guide April 2009 3 1 Block Diagram...
Page 80: ...3 10 Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 94: ...5 10 Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 96: ...A 2 Sun Netra CP3250 Blade Server User s Guide April 2009 FIGURE A 1 BIOS Main Menu...
Page 97: ...Appendix A BIOS Screens A 3 FIGURE A 2 Advanced Configuration Menu...
Page 98: ...A 4 Sun Netra CP3250 Blade Server User s Guide April 2009 FIGURE A 3 CPU Configuration Menu...
Page 99: ...Appendix A BIOS Screens A 5 FIGURE A 4 IDE Configuration Menu...
Page 100: ...A 6 Sun Netra CP3250 Blade Server User s Guide April 2009 FIGURE A 5 USB Configuration Menu...
Page 101: ...Appendix A BIOS Screens A 7 FIGURE A 6 Event Log Control Menu...
Page 103: ...Appendix A BIOS Screens A 9 FIGURE A 8 Remote Access Configuration Menu...
Page 105: ...Appendix A BIOS Screens A 11 FIGURE A 10 Trusted Computing Menu...
Page 106: ...A 12 Sun Netra CP3250 Blade Server User s Guide April 2009 FIGURE A 11 Boot Settings Menu...
Page 107: ...Appendix A BIOS Screens A 13 FIGURE A 12 Boot Device Priority Configuration Menu...
Page 108: ...A 14 Sun Netra CP3250 Blade Server User s Guide April 2009 FIGURE A 13 Security Settings Menu...
Page 109: ...Appendix A BIOS Screens A 15 FIGURE A 14 Exit Menu...
Page 110: ...A 16 Sun Netra CP3250 Blade Server User s Guide April 2009...
Page 125: ...Appendix B Physical Characteristics B 15...
Page 126: ...B 16 Sun Netra CP3250 Blade Server User s Guide April 2009...