1-10
Sun Fire 15K/12K Systems Site Planning Guide • June 2003
1.3
Raised Floor Installations
A raised floor system provides a convenient way to duct cooling air and to route
power and communication cabling. Sun strongly suggests that the system be
installed on a raised floor to ensure that optimal cooling is available to the system.
The computer room floor must be able to support the weight of the system cabinets
(defined previously in
). Each cabinet rests on four casters and four feet that
concentrate the weight of the cabinet on a small surface area.
Place perforated floor panels or floor grilles near or directly under the base of the
system.
illustrates the floor cutouts for cables. Suggested locations for
perforated floor panels or floor grilles are shown in
. Use the floor layout
diagram of the proposed location for the system shown in
to determine
the exact area required for your system. Ensure cabinets are positioned so all casters
and leveling feet are on solid raised-floor tiles.
Sun Microsystems™ suggests a minimum raised floor height of 24–36 in. (61.0–
91.5 cm).
1.4
Non-Raised Floor Installation
If you are not installing your system on a raised floor, ensure the cooling
requirements specified in
can be met. Use cable covers to protect personnel
from injury and protect cables from damage.
Note –
If the cooling to the system is inadequate, automatic system shutdown can
result.
Summary of Contents for Sun Fire 12K
Page 6: ...vi Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 8: ...viii Sun Fire 15K12K Systems Site Planning Guide June 2003...
Page 10: ...x Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 14: ...xiv Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 28: ...1 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 44: ...3 8 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 60: ...A 2 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 64: ...A 6 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 66: ...A 8 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 68: ...A 10 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 70: ...A 12 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 72: ...A 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 74: ...A 16 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 76: ...A 18 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 78: ...A 20 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 80: ...A 22 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 82: ...A 24 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 83: ...B 1 APPENDIX B Compliance Statements...
Page 84: ...B 2 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 96: ...B 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 100: ...Index 4 Sun Fire 15K 12K Site Planning Guide June 2003...