3-2
Sun Fire 15K/12K Systems Site Planning Guide • June 2003
■
It is suggested that the system cabinet utilize twelve single-phase receptacles. See
■
An International Electrotechnical Commission 309 (IEC 309) connector, or NEMA
L6-30P, supplied by Sun Microsystems, connects power to the system.
lists the electrical specifications for the system cabinet or customer selected
I/O expansion rack. See
,
, and
for illustrations of the
possible system power connections. Use
to record the power cable
requirements (see Appendix A for an expanded form to use and retain for your
records).
provides a summary of features of the three power
configurations.
* Contact a Sun Microsystems System Engineer for power cord quantity information
when choosing the proper number of power cords needed for your system
configuration.
TABLE 3-1
Facility Power Requirements
Electrical Service
Specification
System and I/O expansion racks require:
Voltage
200–240 VAC, single phase
Power factor
.99
Frequency
47–63 Hz
Circuit breaker: North America and Japan
Circuit breaker: International
Twelve 30A
Twelve 32A
Current drawn
23,760 VA (Max Load)
Power cords (15 ft maximum)
15 ft (457 cm) connector-compatible drop cord
Receptacle: North America and Japan
Receptacle: International P/N 180-1944-01
NEMA L6-30R or equivalent
IEC 309, single phase, 32A
TABLE 3-2
Facility Power Cable Requirements Worksheet
Frame Type
Number of
Cabinets
Number
of Poles
Number *
of Cords
Single
Phase
3 Phase
System Cabinet (Single Phase)
____
x
2
x
__
= ____
n/a
Total number of poles required
Summary of Contents for Sun Fire 12K
Page 6: ...vi Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 8: ...viii Sun Fire 15K12K Systems Site Planning Guide June 2003...
Page 10: ...x Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 14: ...xiv Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 28: ...1 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 44: ...3 8 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 60: ...A 2 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 64: ...A 6 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 66: ...A 8 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 68: ...A 10 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 70: ...A 12 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 72: ...A 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 74: ...A 16 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 76: ...A 18 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 78: ...A 20 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 80: ...A 22 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 82: ...A 24 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 83: ...B 1 APPENDIX B Compliance Statements...
Page 84: ...B 2 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 96: ...B 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...
Page 100: ...Index 4 Sun Fire 15K 12K Site Planning Guide June 2003...