Chapter 2
Hardware Installation and Removal
15
FIGURE 2-3
Connecting the Optical Cable: Dual Port HBA
2. Connect the other end of the cable to the FC device.
After the optical cable is connected to the HBA, you can power on the system.
▼
To Apply Power
1. Verify that the HBA is securely installed in the system.
2. Verify that the correct fiber-optic cable is attached.
3. Refer to your system installation or service manual to determine how to power
on the system.
4. Observe the light-emitting diode (LED) status for the power-on self test (POST)
results as shown in
The yellow, green, and amber LEDs can be seen through openings in the
mounting bracket of the HBA.
summarizes the LED status conditions.
Summary of Contents for StorageTek SG-XPCIE1FC-QF8-Z
Page 6: ...vi Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 10: ...x Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 20: ...10 Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 46: ...36 Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 48: ...38 Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 50: ...40 Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 53: ...Regulatory Compliance Statements 43...
Page 54: ...44 Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...
Page 68: ...58 Sun StorageTek 8 Gb FC PCI Express HBA Installation Guide September 2009...