Figure 34: Typical Setup- Psi receiving rate instructions E.G Soyl Opti, John Deere Greenstar 

 

 

 

 

GPS Receiver 

Rate instruction 

Bottom 

Port 

Third-party 

Controller 

NOTE:   Power Supply as normal via Pro-Series 50-way 'D' 
connector 

ERIS Custom Interface 
Cable    

Third-party 

Controller 

GPS Receiver 

Rate instruction 

Bottom 

Port 

Top 

Port 

GPS  
Data 

Figure 35.  Typical Setup- Psi receiving rate and GPS instructions via separate cables E.G Trimble 
 

Summary of Contents for DTS 3m

Page 1: ...1 3m 4 0m 4 8m 6 0m 8 0m 9 0m machines 2017 Operator Manual And Parts List Redgates Melbourne York YO42 4RG Tel 01759 319900 Fax 01759 319901 Rev 1 16 1 15 RH...

Page 2: ...cm row spacing Individually mounted seeding units that articulate with ground contours and are governed by a constant flow pressured hydraulic system Leading opener disc for cutting through trash Sing...

Page 3: ...s at Sumo UK Ltd Redgates Melbourne York YO42 4RG Tel 01759 319900 Fax 01759 319901 NO REGISTRATION NO WARRANTY SUMO SERIAL No For your own records Sumo DTS customer Registration Document NAME ADDRESS...

Page 4: ...ng overriding the target rate 19 4 4 INFO screen 20 4 5 Tramlining 20 4 6 Metering motor manual override Half Width Shut off HWSO drilling 22 4 7 Product calibration 23 4 7 1 Initial product calibrati...

Page 5: ...er system 46 9 6 Fan Motor system 46 9 7 Wings Markers system 47 10 0 Parts Assembly Overview 48 10 1 Coulter Overview 49 10 2 Parallel Linkage and Rams 50 10 3 Depth Pins 51 10 4 Leading Disc Unit 52...

Page 6: ...sensor or finger switch responds accurately and quickly Set up to match tractor drawbar height and length extension Fit electric power lead direct to tractor battery Set working depth according to see...

Page 7: ...access steps FREE FLOW RETURN Damage will occur to either the fan motor seal or the oil cooler oil coolers are only fitted to seed fertilizer machines if the free flow return hydraulic line is not co...

Page 8: ...3m Working width 3m 4m 4 8m 6m 8m 9m Tank capacity 1600litres 3000litres 3000litres 3600litres 3600litres 3600litres Coulters 9 12 15 18 24 26 Coulter spacing 33cm 33cm 32cm 33cm 33cm 34 6cm Approx W...

Page 9: ...rack width 4 Marker width setting to allow matching of bouts 3 6m 5 Operation of half width shut off standard on 6m and above via RDS Unit 6 Folding the machine in and out of work without damage 7 Cor...

Page 10: ...ined of within 12 months from the date of receipt by the purchaser or his her nominee of the machine 5 Any claim under this warranty must be made by the original purchaser of the machine and is not as...

Page 11: ...shed Make sure that only authorized personnel work on or with the machine Define the machine operators responsibilities also with regard to observing traffic regulations The operator must have the aut...

Page 12: ...rom the tractor Never allow persons to stand between the tractor and the SUMO machine unless the tractor is secured against rolling away by means of parking brake and or wheel chocks It is forbidden t...

Page 13: ...e motor kit Figure1 RDS Circuit diagram Head Unit Speed Sensor Radar Motor 2 HBM CAN Module Power supply MCM CAN Module Priming Switch Shaft Speed Sensors Land wheel Sensor optional Fan Speed Sensor T...

Page 14: ...arm Information totals The instrument has a special software routine that makes calibration of the metering unit s very easy In the calibration mode each metering unit is controlled via a priming swit...

Page 15: ...eatment for Precision Farming applications the PS 8000i requires a suitable DGPS receiver and a formatted SD data card to implement treatment plans generated in the Precision Farming software A work r...

Page 16: ...divided into 5 sections displaying the following functions Figure 4 MAIN screen single product single metering NOTE The Metering motor status part of the display will appear differently depending on t...

Page 17: ...The instrument is programmed with low and high forward speed alarms Display as Fig 4 except as shown If the drill is in work and the speed is less than 0 5 km h then this section of the MAIN display w...

Page 18: ...status of tramlining Tramline rhythm Symmetrical Assymmetrical left Assymetrical Right 4 2 3 Advancing the bout number On starting up the instrument the tramline sequence always starts at 1 If necess...

Page 19: ...that shown on the RATE screen above If however on the rate screen the current rate is manually adjusted above or below the target rate then this number will flash on for 1 second off for 0 5 second W...

Page 20: ...rhythm select the SETUP screen and press the key Figure 11 Tramline set up screen Select Part Total Normal Total display Reset selected total Seed total Select Grand total display Fertiliser total Are...

Page 21: ...prayer 4 5m drill 12m sprayer 10 pass 4m drill 10m sprayer 6m drill 15m sprayer 10 pass 4m drill 13 3m sprayer 6m drill 20m sprayer 14 pass 3m drill 14 sprayer 4m drill 18 7m sprayer 16 pass 4m drill...

Page 22: ...example a An area of field needs further cultivation before seeding b In the case of a front mounted hopper the metering motor is switched off just before the end of the bout to clear the seed throug...

Page 23: ...ibrate Fig 15 Figure 15 Dual product Single metering 2b Or if configured for dual metering select the metering unit to be calibrated Fig 16 Figure 16 Single Product Dual metering 3 Otherwise select th...

Page 24: ...ain to confirm and store the new calibration factor or press ESC to return to the SETUP menu screen It is recommended to reset the PART TOTAL to zero before commencing drilling This will enable you af...

Page 25: ...unit Fig 16 2 From either screen press the key to select the Calibration Nudge screen Fig 21 3 Enter the theoretical Expected weight noted from the INFO screen at step 1 and press ENTER twice 4 Enter...

Page 26: ...start speed simulation As long as speed simulation is running the forward speed display on the MAIN screen will flash Fig 27 NOTE The pre start function works as normal with a simulated speed 4 10 Sel...

Page 27: ...n 2 Press 1 user setup 3 Press 2 speed sensor factor Figure 29 Main menu screens 4 Go down to option 2 and press enter N B At this point you can manually edit option 1 the SSF as displayed Figure 30 S...

Page 28: ...4 Load Variable rate maps from the log page 5 1 Port cable configuration Figure 32 Port connections Figure 33 Typical Setup Psi sending rate instructions via SD card Bottom Port options Receiving VRT...

Page 29: ...struction Bottom Port Third party Controller NOTE Power Supply as normal via Pro Series 50 way D connector ERIS Custom Interface Cable Third party Controller GPS Receiver Rate instruction Bottom Port...

Page 30: ...MATRON PLUS Third party interface GPS input sending Variable rate Treatment VRT instructions to an OEM third party rate controller GPS BOGBALLE GPS LH5000 v 4 GPS KVERNELAND GPS RAVEN GPS FIELDSTAR Bo...

Page 31: ...ttom port is disabled when an SD card is inserted in the internal data card module On removing the card the port will revert to the function configured on the PORT SETUP screen Table 3 5 4 GPS Receive...

Page 32: ...ation 5 5 GPS Baud Rate The RDS box needs to be configured as shown below to match the baud rate with the 3rd party GPS receiver to be compatible The RDS Default 4800 Figure 39 Baudrate setting 5 6 GP...

Page 33: ...Pro Series can send back the actual application rate to the other controller All setups allow the operator to commence a full VRT application For a and b a full application record of the actual appli...

Page 34: ...single hopper Grain only The hopper lids are spaced so that both sides of the hopper can be filled simultaneously if required Hopper Emptying hatch Each side of the hopper has an emptying hatch so th...

Page 35: ...fitted with fan balancing valves so that adjustment can be made to the velocity of the air travelling through each pipe This may be necessary when there is a large difference in rates between each met...

Page 36: ...ing discs Seed depth Leg depth Leading disc depth Shallow working less aggressive Deep working more aggressive M12 bolt 25mm leg depth pin fitted below the leg arm as a depth stop Shallowest leg depth...

Page 37: ...ngle of the covering discs often work better if reversed so the disc is on the outside of the bearing More disc angle equates to a greater degree of seed cover Less disc angle equtes to less soil dist...

Page 38: ...t respond fast enough increase the oil flow but care must be taken not to over supply to a point where the fans oil supply is compromised The default working pressure is 30bar This pressure will need...

Page 39: ...e marker disc too aggressive as this may affect the performance of the drill To operate A manual hydraulic changeover valve is used to change between wing and marker movement The markers should be ope...

Page 40: ...prime button once again to stop the motor once a suitable sample is collected 6 The seed dispensed out of the ORGA Metering Unit can be weighed using the digital weigh scales supplied with the drill 7...

Page 41: ...ble you after drilling an area to quantify any error in the calibration factor by logging the theoretical amount of product used against a known amount used a whole bag for example 7 3 1 ORGA Metering...

Page 42: ...tank contents Agitation unit has two positions in work illustrated and out of work These positions are secured with a linch pin There are two internal inserts supplied with each Sumo ORGA A long inser...

Page 43: ...should be removed In this circumstance the void is critical to allow smooth seed flow 7 6 Folding the Drill The correct procedure to fold the DTS in order to prevent the seed hoses from being kinked...

Page 44: ...ement parts please have your serial number part numbers and quantities at hand 8 3 Winter storage When machines are to be parked up for the winter period correct storage techniques are an important pa...

Page 45: ...seeding at the end of each run and delays therefore under seeding at the start of each run 9 2 Fan Return Pressure When connecting to a tractor for the first time ensure the fan return pressure is be...

Page 46: ...46 9 5 Coulter system 9 6 Fan Motor system...

Page 47: ...47 9 7 Wings Markers system...

Page 48: ...l Linkage and hydraulic Rams TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and design information found herein remain the sole property of Sumo UK Ltd Reproductions may only be made with t...

Page 49: ...h 10 SWB492 Small Plastic Bush 11 SW1245 Top Parallel Arm 12 SW1246 Bottom Parallel Arm 13 SWM30005 M30 Half Nut not shown 14 SWM24005 M24 Half Nut not shown 15 SW1308 Coulter Side Frame 16 SW1401 Top...

Page 50: ...SWB105 Lynch Pin 4 SWB691 6mm Lynch Pin 5 SWB532 Cast Socket Depth Pins TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and design information found herein remain the sole property of Sumo...

Page 51: ...Cup Head Square 12 SWM12003 M12 Plain Nut 13 SWM12001 M12 Flat Washer 14 SWM1030CHSQ M10 x 30 Cup Head Square 15 SWM1004 M10 Nylock Nut 16 SWM1230 M12 x 30 Bolt 17 SWM12001 M12 Flat Washer 18 SWM12004...

Page 52: ...Clip 7 SWM1040CHSQ M10 x 40 Cup Head Sqaure 8 SWM10004 M10 Nylock Nut 9 SW2307 Fertiliser Outlet optional extra TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and design information found h...

Page 53: ...58 Trash Deflector 8 SWM1030CHSQ M10 x 30 Cup Head Square 9 SWM10001 M10 Flat Washer 10 SWM10004 M10 Nylock Nut 11 SW1496 Weld on Bottom TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and d...

Page 54: ...k Nut 12 SWM825 M8 x 25 Bolt 13 SWM8001 M8 Flat Washer 14 SWM835CHSQ M8 x 35 Cup Head Sqaure 15 SWM8004 M8 Nylock Nut 16 SWM20004 M20 Nylock Nut 17 SWM625 M6 x 25 Bolt 18 SWM6001 M6 Flat Washer 19 SWM...

Page 55: ...WM10040 M10 x 40 Bolt 8 SWM10004 M10 Nylock Nut 9 SWM10001 M10 Flat Washer 10 SWM12001 M12 Flat Washer 11 SW1402 Middle Press Wheel Deflector Mounting PlateE3 TITLE DO NOT SCALE DRAWING DATE INITIAL R...

Page 56: ...6 SWB458 89mm Hose per metre 7 SWB354 127mm Hose per meter not shown 8 SWB469 38mm Jubilee Clip 9 SWB497 89mm Jubilee Clip 10 SWB498 127mm Jubilee Clip 11 SWM660 M6 x 60 Bolt 12 SWM6001 M6 Washer 13...

Page 57: ...SWM16001 M16 Flat Washer 8 SWM16004 M16 Nylock Nut 9 SW1247 50od x 16id x 12 Washer 10 SW2460 70od x 16id x 6 Washer TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and design information fo...

Page 58: ...8 Fan Mounting Bracket 8 SW2254 Single Fan Outlet 9 SW2251 Dual Fan Outlet G F Only 10 SWB674 Oil Cooler G F Only TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and design information found...

Page 59: ...3 3 4 in Line Check Valve 9 SWH321 3 4 Male to Male 10 SWH320 3 4 Swivel Tee 11 SWH359 Relief Valve 12 SWH365 Pressure Gauge not shown TITLE DO NOT SCALE DRAWING DATE INITIAL REVISION Drawings and des...

Page 60: ...0 Tabbed Pin 6m SWP40x160 40 x 160 Tabbed Pin 8m 7 SWP30x195 30 x 195 Tabbed Pin 4m SWP40x215 40 x 215 Tabbed Pin 6m SWP40x225 40 x 225 Tabbed Pin 8m 8 SWP50x200 50 x 200 Tabbed Pin 9 SWP50x280 50 x 2...

Page 61: ...list and Part Numbers Drill head unit Item Part No Description Qty 40 SWB314 Head Unit S HU 268 6 003 1 41 SWB315 Cable Head Unit S CB 268 6 045 1 42 SWB316 Mounting Bracket Kit S PS BKT MK2 1 42 K P...

Page 62: ...1 1 5 SWB298 Junction Box S AC 268 6 049 1 of 2 6 SWB299 Sensor Kit for Seed Shaft K SNR 503 2 of 4 8 SWB300 Switch Kit for Priming Product calibration K ENT SWCH 1 9 SWB301 Magnet Carrier Seed Shaft...

Page 63: ...2 12 SWB299 Sensor Kit for Fan Shaft K SNR 503 1 of 4 13 SWB304 CAN Module HBM S HU 322 5 001 1 14 SWB305 Wiring Harness HBM S CB 322 5 020 1 15 SWB306 Wiring Harness Main S CB 268 6 046 1 16 SWB307 S...

Page 64: ...wer Cable Tractor S CB 500 1 074 1 19 SWB309 Power Supply Kit K ART2 PWR 1 20 SWB310 Radar Sensor Kit K TGSS MK3 UK 1 25 e SWB355 Power lead fuse holder S H661 012 1 25 d SWB363 60 amp fuse S H663 025...

Page 65: ...ion kit A 4m extension cable kit for use with trailed drills Item Part No Description Qty 27 SW896 Power Supply Extension Cable 4m S CB 318 1 022 1 28 SW897 Instrument Extension Cable 4m S CB 318 1 02...

Page 66: ...e supplied in long and short lengths The longer insert approximately halves the rate that the notched slide lets through its aperture They also act as a guide to align the Sumo ORGA The Gears supplied...

Page 67: ...upplied in Long and Short lengths The Longer insert approximately halves the rate that the Notched Slide lets through its aperture They also act as a guide to align the Sumo ORGA The Gears supplied wi...

Page 68: ...ring a tramlining bout This system works by the way of a 3 way solenoid diverter and the hydraulic feed form the bout markers When the bout marker is pressured in to work the spool should be left pump...